Swil20130630_KenneysViaWetWayToShowerbathChamber (m, 360) [1]: 2013/06/30 0.00 "pda Badger, disto Footleg, " 1.0 0.000 0.00 0.00 2.8 10.0 0.000 0.00 0.00 [1] 10.0 10.1 2.190 194.11 16.02 [1] 10.0 10.1 2.190 193.90 16.01 [1] 10.0 10.1 2.190 193.87 16.03 [1] 10.1 0.600 276.70 12.05 [1] 10.1 1.130 263.53 84.69 [1] 10.1 0.860 340.30 -87.68 [1] 10.1 0.220 130.33 11.67 [1] 10.1 10.2 1.140 228.08 32.59 [1] 10.1 10.2 1.140 228.27 32.70 [1] 10.1 10.2 1.140 228.08 32.63 [1] 10.2 0.700 84.60 -2.91 [1] 10.2 0.510 245.48 7.63 [1] 10.2 0.880 181.29 75.58 [1] 10.2 1.150 205.42 -86.76 [1] 10.2 10.3 3.270 163.19 -22.79 [1] 10.2 10.3 3.270 163.41 -22.89 [1] 10.2 10.3 3.270 163.30 -22.91 [1] 10.3 0.640 68.81 -0.15 [1] 10.3 1.800 103.28 -83.45 [1] 10.3 1.690 279.44 83.39 [1] 10.3 1.800 104.43 -50.09 [1] 10.3 0.900 125.15 -23.23 [1] 10.3 0.840 162.44 -25.10 [1] 10.3 0.530 177.50 -0.32 [1] 10.3 10.4 6.900 267.16 3.42 [1] 10.3 10.4 6.910 267.11 3.57 [1] 10.3 10.4 6.910 267.11 3.59 [1] "10.3 to 10.4 dig 10.4 being centre of dig face, muddy floor dig face muddy and pebbly" 10.4 0.550 178.10 2.86 [1] 10.4 0.330 358.62 9.99 [1] 10.4 0.380 76.20 84.09 [1] 10.4 0.440 211.43 -83.57 [1] 10.3 10.5 2.540 190.82 -63.22 [1] 10.3 10.5 2.540 190.39 -63.17 [1] 10.3 10.5 2.550 190.46 -63.14 [1] 10.5 0.600 308.44 -0.68 [1] 10.5 0.720 295.04 -61.80 [1] 10.5 10.6 4.600 251.17 -25.38 [1] 10.5 10.6 4.590 251.08 -25.43 [1] 10.5 10.6 4.590 250.96 -25.52 [1] 10.6 1.060 89.99 22.23 [1] 10.6 0.260 275.62 12.96 [1] 10.6 0.490 129.38 84.49 [1] 10.6 1.440 31.18 16.46 [1] 10.6 10.7 2.940 167.40 7.12 [1] 10.6 10.7 2.940 167.25 7.16 [1] 10.6 10.7 2.940 167.15 7.18 [1] 10.7 1.290 326.65 -21.82 [1] 10.7 0.990 316.84 -22.29 [1] 10.7 0.760 256.67 -44.96 [1] 10.7 0.980 216.45 -34.57 [1] 10.7 0.190 302.09 85.19 [1] 10.7 1.570 162.77 -85.97 [1] 10.7 10.8 3.720 165.60 -0.50 [1] 10.7 10.8 3.720 165.60 -0.44 [1] 10.7 10.8 3.710 165.58 -0.37 [1] 10.8 0.750 39.89 9.56 [1] 10.8 0.420 37.36 78.00 [1] 10.8 1.070 126.50 -89.16 [1] 10.8 10.9 2.100 111.57 19.82 [1] 10.8 10.9 2.100 111.49 19.79 [1] 10.8 10.9 2.100 111.45 19.66 [1] 10.9 0.900 221.02 0.31 [1] 10.9 1.100 120.62 -83.53 [1] 10.9 0.210 316.09 84.80 [1] 10.9 0.250 17.06 -3.95 [1] 10.9 1.740 167.67 -7.64 [1] 10.9 1.770 152.97 -6.07 [1] 10.9 3.170 165.43 5.99 [1] "10.9 station looki up stream at t junction left hand wall on roof orange white calcite tip with lines of develop ment I.e different bands of shading" 10.9 2.880 146.54 8.77 [1] 10.9 2.840 106.66 13.82 [1] "10.9 cross section is looking upstream" 10.9 1.240 97.33 -8.06 [1] 10.9 10.10 7.710 161.71 1.87 [1] 10.9 10.10 7.710 161.57 1.83 [1] 10.9 10.10 7.710 161.89 1.88 [1] 10.10 0.460 262.62 2.57 [1] 10.10 0.360 13.53 -1.36 [1] 10.10 0.650 315.92 77.50 [1] 10.10 0.630 99.67 -84.98 [1] 10.10 10.11 2.160 102.06 5.73 [1] 10.10 10.11 2.160 102.01 5.81 [1] 10.10 10.11 2.160 102.16 5.74 [1] "10.11 the centre line of the left hand passage needs to be moved so it is between the width of the drawn passage. passage continues narrows too tight" 10.9 10.12 8.340 93.86 17.77 [1] 10.9 10.12 8.360 93.78 17.81 [1] 10.9 10.12 8.360 93.52 17.92 [1] 10.12 1.670 330.14 -0.55 [1] 10.12 0.520 155.45 -0.04 [1] 10.12 0.440 246.87 82.62 [1] "10.12 looking downstream passage keyhole shape" 10.12 0.440 67.03 -84.94 [1] 10.12 10.13 4.340 9.56 9.00 [1] 10.12 10.13 4.330 9.48 9.05 [1] 10.12 10.13 4.340 9.38 8.99 [1] 10.13 0.790 243.90 -9.22 [1] 10.13 0.900 67.62 -18.81 [1] 10.13 0.650 256.16 -85.98 [1] 10.13 10.14 2.150 152.69 2.10 [1] 10.13 10.14 2.150 152.79 2.03 [1] 10.13 10.14 2.140 152.95 2.01 [1] 10.14 3.840 296.58 51.55 [1] 10.14 4.810 296.42 51.44 [1] 10.14 3.830 296.46 51.33 [1] "leg 10.4 to tie in point start of dry ways not numbered on this drawing" 10.13 10.15 3.690 88.65 11.46 [1] 10.13 10.15 3.680 88.68 11.63 [1] 10.13 10.15 3.680 88.56 11.52 [1] 10.15 1.220 317.35 3.30 [1] 10.15 0.850 119.43 28.64 [1] 10.15 0.500 294.64 80.22 [1] 10.15 0.300 71.24 -88.13 [1] 10.15 0.530 327.66 -14.96 [1] 10.15 0.250 257.11 80.01 [1] 10.15 10.16 5.870 47.44 18.32 [1] 10.15 10.16 5.880 47.32 18.40 [1] 10.15 10.16 5.900 47.28 18.42 [1] 10.16 0.540 335.23 0.80 [1] 10.16 1.450 160.46 6.63 [1] 10.16 0.270 280.29 80.80 [1] 10.16 10.17 5.340 79.61 18.87 [1] 10.16 10.17 5.340 79.77 18.78 [1] 10.16 10.17 5.350 79.81 18.72 [1] 10.17 1.700 8.32 14.34 [1] 10.17 2.110 303.47 88.21 [1] 10.17 0.650 314.37 -88.24 [1] 10.17 0.830 195.12 7.12 [1] 10.17 2.820 295.58 -11.71 [1] 10.17 2.080 255.83 -15.91 [1] "10.17 water " 10.17 1.170 134.29 25.92 [1] 10.17 2.060 89.62 30.46 [1] 10.17 1.200 51.23 52.50 [1] 10.17 3.760 32.80 57.89 [1] 10.17 0.980 313.51 23.51 [1] "10.17 a gully leading away from the chamber although dry today 20130630 evidence at times takes water" 10.3 0.000 0.00 0.00 [1] 10.3 0.370 221.12 0.55 [1] 10.3 10.18 1.800 105.07 -49.83 [1] 10.3 10.18 1.800 104.98 -49.83 [1] 10.3 10.18 1.800 104.87 -49.78 [1] 10.18 10.19 1.860 143.72 -4.44 [1] 10.18 10.19 1.860 143.66 -4.35 [1] 10.18 10.19 1.860 143.50 -4.25 [1] 10.18 0.780 175.26 4.50 [1] 10.18 0.260 37.36 24.21 [1] 10.18 0.310 183.81 49.92 [1] 10.14 0.000 0.00 0.00 [1] 10.14 10.20 3.880 295.25 51.20 [1] "10.14=point of rock in middle of floor 10.20=two tone calcite point tie in for long dry way survey" 10.14 10.20 3.880 295.15 51.33 [1] 10.14 10.20 3.880 295.04 51.12 [1]