;Tham Loe Pu - Upper Cave ;Book: Martin Ellis Inst:- Malcolm Reid Tape: Claire Dummer ;compass 723445 clino 726759 30m Rabone tape ;Data checked 27 Nov 2002 #date 2002-02-18 #units meters order=dav #flag 2 26a /Entrance ;#note 2 Tham Loe Pu - Upper Cave ;#note 26a Tham Loe Pu - Flood Overflow ;#note 1 Tham Loe Pu - Upper Cave GPS Fix [tree] #seg /surface 2 1 8.6 215 18 <2 2 3 1.8> ;Stn 1 = tree fixed by GPS Stn 2 = Tham Loe Pu - Upper Cave Entrance #seg /cave 2 3 10.3 354 -7 3 <0 3 4 1.4> 4 3 6.3 49 15 <0.5 0.5 3 1.8> 4 5 3.9 229 -40 ;Stn 5 - rock on floor below climb 5 <1.5 3 3 0.5> 6 5 5.5 158 -3 <1 1 2 1.8> 6 7 5.3 26 -9 7 <1 0 4 1.5> 8 7 2.1 108 -13 <1 0.5 4 1.8> 8 9 4.1 10 -8 9 <0.5 0.2 1 1.6> 10 9 7.7 96 1 <2 4 3 1.8> ;First chamber towards rift chamber 10 11 18.4 10 -11 11 <1 1 5 1.6> 12 11 7.8 210 2 <1.5 1.5 5 1.8> 12 13 5.8 54 3 13 <2 0.5 4 1.6> 14 13 8.1 153 2 <3 1 2 1> 14 15 7.1 12 18 ;Stn 15 - cairn 15 <2 1 4 1.6> ;First chamber to streamway 10 16 9.8 255 -2 16 <3 3 2 1.6> 17 16 5.4 90 19 <0.5 0.5 0.5 1.8> 17 18 7.5 350 -7 18 <0.8 0.8 1.5 1.6> 19 18 3.9 69 17 <3 3 5 1.8> ;Stn 19 - in streamway, Marked on rock. ;Rift chamber to streamway 15 29 24.7 352 5 29 <0.5 3 3 1.6> 30 29 9.4 71 -13 <0.5 3 0.3 1.8> 30 31 10.1 302 0 ;Stn 31 at top of pitch down into stream 31 <2 1 0.5 1.6> 31 31a 17 0 -90 ;manufactured leg for pitch down to strea, 15 32 10.1 358 -1 32 <0.3 0.3 3 1.6> 33 32 5.4 232 -6 <0.2 0.2 3 1.8> 33 34 19.8 7 1 34 <2 5 3 1.6> 35 34 29.4 162 -1 <3 4 5 1.8> 35 36 10.4 328 -35 36 <2 0.1 0.6 0.8> 36 37 2.3 222 -21 37 <0.2 0.2 1 1.6> 38 37 5.6 150 43 <0.5 0.5 3 1.8> 39 38 8.5 137 14 <2 2 6 1.8> ;Stn 39 - stood at junction with stream on pebbles on RHS. #seg /cave/stream 39 40 30.2 333 0 ;One leg heading downstream. Stn 40 - marked on rib of rock pointing upstream at Y junction 40 <2 2 4 1> 39 41 10.3 207 3 ;One leg heading upstream. Stn 41 - marked on LH wall 1.5m above floor at junction with high level inlet. 41 <2 0 3 1.5> ;Downstream in smaller streamway 19 20 8.5 358 -8 20 <1 1 3 1.6> 21 20 6 245 10 <1.5 1.5 3 1.6> 21 22 5.6 2 4 22 <1.5 1.5 3 1.6> 23 22 7.5 133 20 <0.3 0.3 0.2 1> 23 24 5.6 335 4 24 <0.6 2 4 1.6> 25 24 3.2 126 12 <1.5 1.5 2 1.8> ;survey joins with that by Ed Waters & Steve King ;Upstream in smaller streamway 19 26 16 173 2 ;Stn 26 = small entrance/stream sink 5m above 26 <2 2 4 1.6> 26 26a 6 173 80 ;manufactured leg to entrance 26a <0.5 0.5 0.5 0.5> 27 26 6.4 309 -2 <1 1 0.5 1> 27 28 4.5 60 18 ;continues small - should link up with first chamber? 28 <0.6 0.6 0.5 1> ;Book: Ed Waters Inst: Steve King ;compass 740943 clino 640941 20m Fibron tape 25 E7 6.3 348 1 ;Stn E7 - on LH wall at junction with rift across to other streamway. E7 <1.5 1 8 0> E7 E6 2.9 121 -35 E6 E5 4.6 34 -18 <1.5 1 8 0> E5 E4 4.9 359 -8 <2 1 2 0.6> E4 E3 6.8 92 -9 <2 0 3 0.6> E3 E2 7.8 335 -2 <0 3.5 2 0.3> E2 E1 6.2 80 5 <2 0 1.5 0.3> E1 Sump 10 075 -2 <1 0.6 3 1.5> Sump <0.5 0.3 0 0>