encoding utf-8 input upper.th2 survey upper centreline title "Upper Apprentice Series" date 2005.09.18 team "Tim Allen" notes team "Rob Eavis" instruments team "Rob Eavis" tape data normal from to tape compass clino ignoreall 1 2 12.98 149 11 2 3 43.6 199 5 3 4 32.02 195 5 4 5 56.49 204 -1.5 5 6 31.29 237 -11.5 6 7 37.56 183 +4 7 8 41.86 177 5 8 9 26.41 222 5.5 9 10 28.08 192 -14 10 11 55.09 225 2.5 11 12 47.02 205 +0.5 12 13 40.5 196 2.5 13 14 47.8 215 -3.5 14 15 24.76 208 -5 15 16 43.94 194 -3 16 17 35.89 237 14.5 17 18 29.45 239 -21 18 19 43.52 197 9 19 20 54.78 182 8 20 21 44.39 192 -7 21 22 31.42 339 7 22 23 29.08 252 -21.5 23 24 50.61 203 -2 24 25 34.13 211 0 25 26 17.79 262 20 26 27 35.31 287 10 27 28 12.88 279 -17 28 29 15 284 -7.5 29 30 18.73 265 -28 30 31 22.46 202 -3 1 40 36.82 80 17 40 41 65.75 13 -4 41 42 61.28 29 0 42 43 41.28 19 -2.5 43 44 52.67 22 0 44 45 38.64 22 3.5 45 46 58 26 0 46 47 73.62 30 1 1 100 40.08 279 -48 100 101 18.15 249 -27 101 102 13.25 240 -33 102 103 13.21 191 -5.5 103 104 8.77 238 -6 104 105 18.74 188 20 105 106 31.15 186 8 106 107 44 265 -41 107 108 18.61 329 -49 108 is station 12 of up and running data dimensions station left right up down ignoreall 1 4 6 12 - TOP OF RAMP 2 13.1 13.8 16.4 2 3 12.6 17.5 12.2 5 4 5.2 15.3 4.3 6 5 4 20 12 12 6 15 12 5 2 7 20 13 9.5 5 POSSIBLE SIDE PASSAGE ON LEFT 8 10 16 6.5 5 9 13 7 4.5 6 10 2 17 8 1 11 21 8 5 2 12 14.5 15 2 4 13 5.5 18 4 5 DRAUGHTING RAMP ON LEFT (SNAKE SKINS) 14 7.5 14.5 0 1.5 15 17 11 0.5 4 16 7 18 7 4 17 10 10 4 10 18 16.5 6.5 6 2 19 5 30 16.5 1 20 11 23 11.5 5 SMALL RAMP UP 21 7.5 9.5 7 2 SOUTHERLY CONTINUATION DRAUGHTS 22 27.5 11 9 1 23 15 6 5.5 1 24 2.5 7 2 2 25 1 6 7 4 26 1 2 4 0 27 4.5 4 3 0 28 2 2 0 2 29 6.5 1.5 5 0.5 30 4 1 4 0.5 #31 DRAUGHTING SQUEEZE UNCERTAIN PROSPECTS 40 22 2.5 13 1 41 10 13 8 1.5 42 14 12 6 2 43 3.5 11 3 0 44 8 6.5 10.5 0 45 14 4 7.5 5 46 12 6.5 5 1 47 14 11 8 12 CONTINUES BIG WITH WIND 100 6 5 20 1 bACK DOWN RAMPS 101 4.5 10 4.5 1 102 6 4 5 2 103 3 6 5 1 104 3 8 0 1 105 5 4 4 1 106 2 6 3 0 107 1 5.5 4 2 STATION 12 IN UP AND RUNNING endcentreline endsurvey survey upper2 centreline title "Upper Series" date 2005.09.22 team "Tim Allen" notes team "Matt Kirby" instruments team "Matt Kirby" tape data normal from to tape compass clino ignoreall 47 48 56.25 93 -10 48 49 29.93 049 +5 49 50 12.7 12.5 +11 50 51 3.96 67 +38 51 52 14.7 84 -12 52 53 13.27 120 -15 53 54 8.36 256 0 54 55 23.41 184 -2.5 55 56 10.34 85 -2 56 57 17.91 159 +10 57 58 62 118 +1 58 59 20.14 140 +25.5 59 60 23.04 180 -7 60 61 44 135 -14 61 62 43.9 190 +13 62 63 43.2 204 +2 63 64 19.3 205.5 -7.5 64 65 9.47 147 +3 65 66 9.66 83 -8 66 67 37.5 84 0 67 68 23.48 173.5 +6 68 69 20.96 207.5 +2.5 69 70 27.07 225 -4 data dimensions station left right up down ignoreall # 47 on upper survey 2m diamiter passage high on right, and 6by4 on right low down 48 8.4 18 12.9 2 49 5 - 12 2 possible high level passage on right 50 0 - 10 2 51 0 - 12 - 53 15 33 15 2 55 30 4.6 2 2 big hole in floor 56 23 1 5 25 57 18 10 1 5 58 26.9 15 6 1 59 12 15 2.5 5 60 9.5 9 9 6 61 - - - - passage heads north on LHS 62 3 7 3 2 63 2.8 6.5 2.9 1.8 64 2.1 9 6.6 1 big ramps down 50m plus 65 8.7 8.9 6 1 66 9 5.2 4.6 2 67 0.5 13.6 5 12 2by2 passage on left with main draught 68 1.6 11.6 3 2 ramp on right with small draught 69 3 5.4 5 1.2 70 - - - - cobbled total choke endcentreline endsurvey survey dicksdefeat centreline title "Dicks defeat" date 2005.10.4 team "Martin Holroyd" notes team "Tim Allen" instruments team "Tim Allen" tape data normal from to tape compass clino ignoreall 21 22 28.13 200 -7 22 23 62.38 210 0.5 23 24 31.05 213 -2 24 25 27.52 208 2.5 25 26 41.07 212 -2 26 27 10.17 263 3 27 28 18.49 313 -17 28 29 8 230 1 data dimensions station left right up down ignoreall 21 7 10 6 5 22 4 4 5 0.5 23 3 6 1.7 1.6 24 4.2 4.7 0.8 0.5 25 3.7 14 6 1.6 26 5.3 8.5 3.2 4 27 19 11 7.5 3 28 3 2 2 1.6 29 0.5 0.5 0 5 endcentreline endsurvey equate 47@upper 47@upper2 equate 21@upper 21@dicksdefeat