survey swift_shadow centreline #compass has been read incorrectly creating large loop error. I have adjusted the main line manually #to bring it within acceptable parameters. This is based on adding 3 degrees to each bearing #although some individual readings have been adjusted more. Clino was reading 0.5 degree out but #declination only allows for whole numbers therefore only some individual readings have been adjusted. #the original readings are in brackets before the lrud. Tim title "Swift Shadow" date 2009.01.21 team "James Alker" notes team "James Alker" instruments team "Rob Middleton" dog data normal from to tape compass clino ignoreall 1 2 54.7 233 -13 (230,-15) Station 2 Moose, tim, dave cowley 4/12/07 2 3 40.7 15 -1 2 4 39.6 213 0 (210) 4 5 17 183 7 (180) 5 6 17.2 190 20 5 7 29.3 239 -12 (236,-13) 7 8 36.4 224 -3 (221) 8 9 16.9 210 23 (207) 9 10 24.3 195 0 (192) Junction at top of ramp 10 11 39.3 318 -34 11 12 6.6 332 -7 12 13 36 236 -25 13 14 13.3 305 -20 14 15 20.6 24 7 15 16 22.7 353 -15 16 17 11.7 257 -7 17 18 14.9 230 -15 18 19 14.4 340 -26 19 20 14.4 6 -24 20 21 22.2 212 -1 Junction 21 22 23.3 201 -1 22 23 9 220 -14 24 23 10.8 334 -12 24 25 19 199 -1 25 26 18.7 214 -4 26 27 12.8 264 3 27 28 11.8 251 -12 28 29 14.6 192 4 29 30 9 252 1 30 31 7.4 204 -10 31 32 13.3 219 -16 32 33 17.5 256 -38 33 34 15 256 -38 Estimate 20 35 30.2 27 5 35 36 21.7 90 27 35 37 13.8 325 -27 37 38 15.9 12 0 38 39 13.9 22 -31 39 40 9.5 27 -1 40 41 14.7 7 -20 41 42 6 327 5 42 43 20.5 348 32 43 44 14.1 353 5 Rift trends at 50/230 degrees 70 degrees dip south 10 46 39.8 117 35 (109) 46 47 20.3 193 21 (190) 47 48 46.5 227 -13 (224,-16) 48 is station 7 DN TA DC 4/2/07 48 49 29.9 255 27 (252) sitting 49 50 12.4 247 -9 (244) 50 51 40.4 267 5 (264) 51 52 13 254 -9 (251) 52 53 34.1 231 -15 (228,-18) 53 54 53.3 257 3 (254) 54 55 36.4 241 3 (238) 55 56 16.7 263 -2 (260) 56 57 19.6 348 0 (355) 57 58 37.1 249 -8 (246) 58 59 18.3 285 -4 (282) 59 60 22.7 310 19 (315) 60 61 17.7 278 -18 (275,-22) 61 62 22.7 266 18 (263) 62 63 27.8 313 -15 (320,-17) 63 64 46.8 203 2 (200) 64 65 28.1 264 -3 (261) 65 66 50.3 250 0 (247) 66 67 32.8 226 10 (223) data dimensions station left right up down 1 12 20 19 4 2 11.5 9.5 7 4 2 5 10 4 1.5 4 11.5 9.5 7 4 5 16 9 5 1.5 5 16 9 5 1.5 7 10 3 1.5 3 8 14 5.5 8 1.5 9 20 6.5 7.5 6 10 70 10 8 1.5 11 2 4 1 1.5 12 6 9 9 1.5 13 1 7 3 1 14 2 2 1 1 15 6.5 1 1 1.5 16 6.5 1 1 1.5 17 3 1 2 1.5 18 2 4 1 1.5 19 2 5 1 1 20 2 4 3 1.5 21 2 0.5 2 1.5 22 0.5 3 0.5 1.5 24 3 5 1 0 24 3 0 4 1.5 25 1 2 2 1 26 0 3 2 1.5 27 2.5 1 1 1.5 28 2.5 1 1 1.5 29 1 2 1 1.5 30 2 1 2 1.5 31 2.5 1 3 1.5 32 1.5 1.5 2 1.5 33 1.5 1.5 2 1.5 20 2 5 1 1 35 2 3 2 1.5 35 2 3 2 1.5 37 2 1 2 1.5 38 1 3 2 1.5 39 3 1 1 1 40 2 1 0.5 1.5 41 3 1 0 1.5 42 2 2 2 1.5 43 7 2 0 1.5 10 40 22 8 1.5 46 20 15 20 1.5 47 25 12 9 0.5 48 12 24 13 0.5 49 8 9 2 1.5 50 5 8 5 0.5 51 8 10 4 1.5 52 6 4 4 0.5 53 5 14 3 1 54 8 8 7 1.5 55 18 5 10 0.5 56 10.5 7.5 8 1.5 57 20 11 7.5 1.5 58 12 10 8 1 59 13 8 7 1.5 60 7 12 4 1.5 61 8.5 3.5 4 2 62 8 8 8 1.5 63 10 8 5.5 0.5 64 3 22 10 1.5 65 6 18 8 1.5 66 13 2 5 0.5 endcentreline endsurvey survey swift_shadow2 centreline #compass has been read incorrectly creating large loop error. I have adjusted the main line manually #to bring it within acceptable parameters. This is based on adding 3 degrees to each bearing #although some individual readings have been adjusted more. Tim title "Swift Shadow 2" date 2009.01.24 team "Robbie Shone" notes team "James Alker" instruments team "Rob Middleton" dog data normal from to tape compass clino ignoreall 0 1 54.9 229 -13 (226) Station 2 Moose, tim, dave cowley 4/12/07 1 2 39.9 215 2 (212) 2 3 16.6 183 12 (180) 3 4 16.7 193 17 (190) 4 5 41 215 5 (212) 5 6 62.3 193 20 Station 6 Moose, tim, dave cowley 4/12/07 5 7 29.5 214 8 (211) 7 8 38.7 244 -18 (241) 8a 8 17.2 213 6 Station 10 Moose, tim, dave cowley 4/12/07 8 9 20.3 243 -30 (240) 9 10 28.2 243 -16 9 11 22.7 173 28 (170) 11 12 24.3 238 0 (235) 12 13 33.1 193 -15 (190) 13 14 23.1 235 -9 (232) 14 15 15.6 288 -12 (285) 15 16 54.5 239 2 (236) 16 17 48.6 224 -4 (214) 17 18 12.9 285 7 (282) Station 13 Moose, tim, dave cowley 4/12/07 18 19 54.7 305 46 (305) Station 55 James alker,rob middleton 21/1/09 data dimensions station left right up down 0 12 20 19 4 1 5 10 4 1.5 2 11.5 9.5 7 4 3 16 9 5 1.5 4 14 20.5 3 0.5 5 9.5 4 2.5 1 7 48.5 42 13.5 1.5 8a 20 10 7 0.5 8 7 7 2.5 0.5 9 5 3 1 1.5 11 1 12 8 1.5 12 16 15 10 3 13 3.5 6.5 5 4 14 10 7 4.5 0.5 15 7 5 6.5 1.5 16 6 9 6.5 4 17 3.5 13.5 9 0.5 18 16.5 11 14.5 0.5 endcentreline endsurvey survey swift_shadow3 centreline title "Swift Shadow 3" data normal from to tape compass clino ignoreall 0 1 24.1 248 -14 1 2 20.5 220 5 2 3 45 208 1 3 4 6.7 203 -15 data dimensions station left right up down ignoreall 0 12 10 6 1 #0 = stn 9 of Swift Shadow 2 240109 1 5 4 3 2 2 3 3 3 3 3 2 6 4 4 #stn 4 = stn 15 ? 24/01/09 endcentreline endsurvey survey swift_shadow4 centreline title "Swift Shadow 4" date 2009.01.29 team "Pete Hall" notes team "James Alker" instruments team "Rob Middleton" dog data normal from to tape compass clino ignoreall 9 10 25.2 169 23 stn 9 = 14 24/01/09 10 11 9.5 183 39 11 12 30.6 62 8 stn 12 = stn 9 bigness south data dimensions station left right up down 9 11 9 5 1 10 2 2 1 1 11 4 10 16 2 endcentreline endsurvey equate 1@swift_shadow 0@swift_shadow2 equate 0@swift_shadow3 9@swift_shadow2 equate 9@swift_shadow4 14@swift_shadow2 input swift_shadow.th2