Surface, Sepayang. SURVEY NAME: SSEP/0 SURVEY DATE: 5 25 1998 SURVEY TEAM: Philip Ding, Thambi, Robert, Dave. DECLINATION: 0.00 FORMAT: DMMDLRUDLADN FROM TO LENGTH BEARING INC LEFT UP DOWN RIGHT FLAGS COMMENTS SSEP/0 SSEP/1 66.60 120.00 0.00 0.00 0.00 0.00 0.00 Junction of streams. SSEP/1 SSEP/2 95.14 107.00 0.00 0.00 0.00 0.00 0.00 SSEP/2 SSEP/3 57.09 115.00 12.00 0.00 0.00 0.00 0.00 House. SSEP/3 SSEP/4 90.22 95.00 2.00 0.00 0.00 0.00 0.00 L and S Peg. SSEP/4 SSEP/5 54.13 164.00 10.00 0.00 0.00 0.00 0.00 SSEP/5 SSEP/6 19.03 246.00 0.00 0.00 0.00 0.00 0.00 SSEP/6 SSEP/7 22.64 214.00 -18.00 0.00 0.00 0.00 0.00 Lubang Ulang ent Surface, Sepayang. SURVEY NAME: SSEP/0-1 SURVEY DATE: 5 25 1998 SURVEY TEAM: Philip Ding, Robert, Dave. DECLINATION: 0.00 FORMAT: DMMDLRUDLADN FROM TO LENGTH BEARING INC LEFT UP DOWN RIGHT FLAGS COMMENTS SSEP/0 SSEP/8 72.83 322.00 11.00 0.00 0.00 0.00 0.00 SSEP/8 SSEP/9 62.34 298.00 0.00 0.00 0.00 0.00 0.00 SSEP/9 SSEP/10 63.98 281.00 0.00 0.00 0.00 0.00 0.00 SSEP/10 SSEP/11 63.98 232.00 -1.00 0.00 0.00 0.00 0.00 SSEP/11 SSEP/12 125.00 246.00 2.00 0.00 0.00 0.00 0.00 SSEP/12 SSEP/13 97.11 300.00 3.00 0.00 0.00 0.00 0.00 SSEP/13 SSEP/14 167.65 294.00 4.00 0.00 0.00 0.00 0.00 Track junction of trail to L Pedan. Surface, Sepayang. SURVEY NAME: SSEP/14 SURVEY DATE: 5 26 1998 SURVEY TEAM: Thambi, Robert, Dave. DECLINATION: 0.00 FORMAT: DMMDLRUDLADN FROM TO LENGTH BEARING INC LEFT UP DOWN RIGHT FLAGS COMMENTS SSEP/14 SSEP/15 164.04 339.00 5.00 0.00 0.00 0.00 0.00 from junction of main trail to house. SSEP/15 SSEP/16 39.37 334.00 19.00 0.00 0.00 0.00 0.00 SSEP/16 SSEP/17 150.92 41.00 17.00 0.00 0.00 0.00 0.00 SSEP/17 SSEP/18 160.76 37.00 6.00 0.00 0.00 0.00 0.00 SSEP/18 SSEP/19 82.02 46.00 15.00 0.00 0.00 0.00 0.00 SSEP/19 SSEP/20 157.48 67.00 10.00 0.00 0.00 0.00 0.00 SSEP/20 SSEP/21 164.04 57.00 2.00 0.00 0.00 0.00 0.00 SSEP/21 SSEP/22 154.20 47.00 7.00 0.00 0.00 0.00 0.00 SSEP/22 SSEP/23 72.18 1.00 2.00 0.00 0.00 0.00 0.00 SSEP/23 SSEP/24 39.37 330.00 0.00 0.00 0.00 0.00 0.00 SSEP/24 SSEP/25 49.21 332.00 -3.00 0.00 0.00 0.00 0.00 SSEP/25 SSEP/26 22.97 334.00 2.00 0.00 0.00 0.00 0.00 SSEP/26 SSEP/27 26.25 29.00 -17.00 0.00 0.00 0.00 0.00 SSEP/27 SSEP/28 45.93 325.00 -1.00 0.00 0.00 0.00 0.00 SSEP/28 SSEP/29 27.56 333.00 -24.00 0.00 0.00 0.00 0.00 Ent of L Pedang. Surface, Sepayang. SURVEY NAME: SEPU/17 SURVEY DATE: 5 26 1998 SURVEY TEAM: Robert, Thambi, Dave. DECLINATION: 0.00 FORMAT: DMMDLRUDLADN FROM TO LENGTH BEARING INC LEFT UP DOWN RIGHT FLAGS COMMENTS U/17 SU/31 9.84 345.00 26.00 0.00 0.00 0.00 0.00 Ent of L Urung. SU/31 SU/32 16.40 212.00 46.00 0.00 0.00 0.00 0.00 SU/32 SU/33 28.54 232.00 6.00 0.00 0.00 0.00 0.00 SU/33 SU/34 26.25 182.00 31.00 0.00 0.00 0.00 0.00 House door SU/34 SU/35 28.22 180.00 4.00 0.00 0.00 0.00 0.00 other side of house. SU/35 SU/36 45.93 236.00 -1.00 0.00 0.00 0.00 0.00 SU/36 SU/37 58.07 144.00 24.00 0.00 0.00 0.00 0.00 SU/37 SU/38 22.31 171.00 37.00 0.00 0.00 0.00 0.00 SU/38 SU/39 26.90 149.00 13.00 0.00 0.00 0.00 0.00 SU/39 SU/40 40.68 180.00 22.00 0.00 0.00 0.00 0.00 SU/40 SU/41 44.62 213.00 12.00 0.00 0.00 0.00 0.00 on left, trail to L Besara and L Udeng. SU/41 SU/42 53.81 257.00 -19.00 0.00 0.00 0.00 0.00 SU/42 SU/43 68.90 273.00 -4.00 0.00 0.00 0.00 0.00 SU/43 SU/44 87.93 268.00 -3.00 0.00 0.00 0.00 0.00 SU/44 SU/45 56.10 252.00 -2.00 0.00 0.00 0.00 0.00 SU/45 SU/46 164.04 269.00 -8.00 0.00 0.00 0.00 0.00 SU/46 SU/47 128.28 263.00 -2.00 0.00 0.00 0.00 0.00 SU/47 SU/48 101.71 244.00 0.00 0.00 0.00 0.00 0.00 SU/48 SU/49 45.93 279.00 2.00 0.00 0.00 0.00 0.00 SU/49 SU/50 65.62 265.00 -4.00 0.00 0.00 0.00 0.00 SU/50 SU/51 125.98 263.00 -3.00 0.00 0.00 0.00 0.00 SU/51 SU/52 93.50 227.00 -5.00 0.00 0.00 0.00 0.00 SU/52 SU/53 95.14 197.00 1.00 0.00 0.00 0.00 0.00 SU/53 SU/54 135.50 178.00 -7.00 0.00 0.00 0.00 0.00 SU/54 SU/55 109.91 168.00 4.00 0.00 0.00 0.00 0.00 SU/55 SU/56 70.21 105.00 1.00 0.00 0.00 0.00 0.00 SU/56 SU/57 127.30 159.00 -5.00 0.00 0.00 0.00 0.00 SU/57 SU/58 83.99 174.00 3.00 0.00 0.00 0.00 0.00 SU/58 SU/59 86.61 158.00 2.00 0.00 0.00 0.00 0.00 SU/59 SSEP/26 59.06 127.00 -9.00 0.00 0.00 0.00 0.00 SU/41 SU/41a 262.47 90.00 0.00 0.00 0.00 0.00 0.00 Surface, Sepayang. SURVEY NAME: SSEP/60 SURVEY DATE: 5 28 1998 SURVEY TEAM: Thambi, Robert, Dave Gill. DECLINATION: 0.00 FORMAT: DMMDLRUDLADN FROM TO LENGTH BEARING INC LEFT UP DOWN RIGHT FLAGS COMMENTS SSEP/0 SSEP/60 25.26 120.00 -1.00 0.00 0.00 0.00 0.00 SSEP/60 SSEP/61 77.76 255.00 0.00 0.00 0.00 0.00 0.00 cave, rising of stream. SSEP/61 SSEP/62 50.52 318.00 2.00 0.00 0.00 0.00 0.00 SSEP/62 SSEP/63 64.63 265.00 8.00 0.00 0.00 0.00 0.00 SSEP/63 SSEP/64 77.43 247.00 -3.00 0.00 0.00 0.00 0.00 SSEP/64 SSEP/65 71.85 245.00 0.00 0.00 0.00 0.00 0.00 SSEP/65 SSEP/66 83.01 272.00 -3.00 0.00 0.00 0.00 0.00 cave entrance ? SSEP/66 SSEP/67 31.50 228.00 4.00 0.00 0.00 0.00 0.00 Land and Survey peg 107. SSEP/67 SSEP/68 80.05 271.00 2.00 0.00 0.00 0.00 0.00 SSEP/68 SSEP/69 46.59 265.00 2.00 0.00 0.00 0.00 0.00 SSEP/69 SSEP/70 37.07 244.00 6.00 0.00 0.00 0.00 0.00 SSEP/70 SSEP/71 46.92 253.00 -9.00 0.00 0.00 0.00 0.00 stream sink. SSEP/71 SSEP/72 24.61 264.00 3.00 0.00 0.00 0.00 0.00 SSEP/72 SSEP/73 62.99 287.00 1.00 0.00 0.00 0.00 0.00 cave entrance ? SSEP/73 SSEP/74 43.64 304.00 -3.00 0.00 0.00 0.00 0.00 SSEP/74 SSEP/75 32.15 251.00 11.00 0.00 0.00 0.00 0.00 SSEP/75 SSEP/76 78.74 295.00 -2.00 0.00 0.00 0.00 0.00 SSEP/76 SSEP/77 92.52 300.00 0.00 0.00 0.00 0.00 0.00 at stream and track up to main road. Surface, Sepayang. SURVEY NAME: SSEP/78 SURVEY DATE: 5 28 1998 SURVEY TEAM: Robert, Thambi. Dave. DECLINATION: 0.00 FORMAT: DMMDLRUDLADN FROM TO LENGTH BEARING INC LEFT UP DOWN RIGHT FLAGS COMMENTS SSEP/77 SSEP/78 97.11 307.00 2.00 0.00 0.00 0.00 0.00 up stream in shale bed. SSEP/78 SSEP/79 32.81 251.00 -2.00 0.00 0.00 0.00 0.00 SSEP/79 SSEP/80 47.24 222.00 3.00 0.00 0.00 0.00 0.00 SSEP/80 SSEP/81 120.73 249.00 1.00 0.00 0.00 0.00 0.00 SSEP/81 SSEP/82 87.93 276.00 2.00 0.00 0.00 0.00 0.00 Pepper garden. SSEP/82 SSEP/83 75.46 252.00 1.00 0.00 0.00 0.00 0.00 SSEP/83 SSEP/84 99.74 263.00 2.00 0.00 0.00 0.00 0.00 SSEP/84 SSEP/85 96.13 265.00 4.00 0.00 0.00 0.00 0.00 SSEP/85 SSEP/86 90.55 314.00 2.00 0.00 0.00 0.00 0.00 clearing. SSEP/86 SSEP/87 64.63 282.00 2.00 0.00 0.00 0.00 0.00 SSEP/87 SSEP/88 81.69 251.00 6.00 0.00 0.00 0.00 0.00 SSEP/88 SSEP/89 59.38 255.00 5.00 0.00 0.00 0.00 0.00 SSEP/89 SSEP/90 56.43 316.00 8.00 0.00 0.00 0.00 0.00 SSEP/90 SSEP/91 32.48 276.00 10.00 0.00 0.00 0.00 0.00 stream junction. SSEP/91 SSEP/91a 262.47 0.00 0.00 0.00 0.00 0.00 0.00 SSEP/91 SSEP/92 63.32 233.00 4.00 0.00 0.00 0.00 0.00 SSEP/92 SSEP/93 53.81 246.00 7.00 0.00 0.00 0.00 0.00 SSEP/93 SSEP/94 31.50 279.00 12.00 0.00 0.00 0.00 0.00 SSEP/94 SSEP/95 33.79 288.00 14.00 0.00 0.00 0.00 0.00 end of stream. SSEP/95 SSEP/96 34.45 257.00 21.00 0.00 0.00 0.00 0.00 SSEP/96 SSEP/97 54.13 262.00 9.00 0.00 0.00 0.00 0.00 SSEP/97 SSEP/98 51.84 252.00 7.00 0.00 0.00 0.00 0.00 SSEP/98 SSEP/99 35.10 240.00 17.00 0.00 0.00 0.00 0.00 SSEP/99 SSEP/100 76.44 267.00 33.00 0.00 0.00 0.00 0.00 skid trail. SSEP/100 SSEP/101 59.71 176.00 17.00 0.00 0.00 0.00 0.00 SSEP/101 SSEP/102 25.92 148.00 6.00 0.00 0.00 0.00 0.00 SSEP/102 SSEP/103 49.87 209.00 2.00 0.00 0.00 0.00 0.00 SSEP/103 SSEP/104 21.65 187.00 0.00 0.00 0.00 0.00 0.00 SSEP/104 SSEP/105 31.17 231.00 0.00 0.00 0.00 0.00 0.00 SSEP/105 SSEP/106 43.96 187.00 6.00 0.00 0.00 0.00 0.00 SSEP/106 SSEP/107 69.23 174.00 12.00 0.00 0.00 0.00 0.00 SSEP/107 SSEP/108 41.99 158.00 0.00 0.00 0.00 0.00 0.00 logging trail down to stream. Surface, Sepayang. SURVEY NAME: SSEP/108 SURVEY DATE: 5 28 1998 SURVEY TEAM: Robert, Thambi, Dave. DECLINATION: 0.00 FORMAT: DMMDLRUDLADN FROM TO LENGTH BEARING INC LEFT UP DOWN RIGHT FLAGS COMMENTS SSEP/108 SSEP/109 131.89 252.00 10.00 0.00 0.00 0.00 0.00 up the road towards main road. SSEP/109 SSEP/110 164.04 263.00 3.00 0.00 0.00 0.00 0.00 SSEP/110 SSEP/111 121.06 250.00 5.00 0.00 0.00 0.00 0.00 SSEP/111 SSEP/112 164.04 225.00 0.00 0.00 0.00 0.00 0.00 SSEP/112 SSEP/113 95.14 221.00 2.00 0.00 0.00 0.00 0.00 house on left. SSEP/113 SSEP/114 164.04 259.00 8.00 0.00 0.00 0.00 0.00 SSEP/114 SSEP/115 125.98 235.00 4.00 0.00 0.00 0.00 0.00 SSEP/115 SSEP/116 132.55 220.00 3.00 0.00 0.00 0.00 0.00 SSEP/116 SSEP/117 164.04 245.00 0.00 0.00 0.00 0.00 0.00 SSEP/117 SSEP/118 70.87 258.00 3.00 0.00 0.00 0.00 0.00 junction of main road. SSEP/118 SEP/118a 164.04 348.00 0.00 0.00 0.00 0.00 0.00 shot along main road. Surface, Sepayang. SURVEY NAME: SSEP/118 SURVEY DATE: 5 29 1998 SURVEY TEAM: Robert Gani, Thambi Ipoi, David Gill. DECLINATION: 0.00 FORMAT: DMMDLRUDLADN FROM TO LENGTH BEARING INC LEFT UP DOWN RIGHT FLAGS COMMENTS SSEP/118 SSEP/119 164.04 273.00 2.00 0.00 0.00 0.00 0.00 along main road towards Baram river. SSEP/119 SSEP/120 164.04 260.00 -2.00 0.00 0.00 0.00 0.00 SSEP/120 SSEP/121 164.04 252.00 -4.00 0.00 0.00 0.00 0.00 SSEP/121 SSEP/122 164.04 256.00 -1.00 0.00 0.00 0.00 0.00 SSEP/122 SSEP/123 164.04 270.00 -4.00 0.00 0.00 0.00 0.00 SSEP/123 SSEP/124 164.04 270.00 -5.00 0.00 0.00 0.00 0.00 SSEP/124 SSEP/125 164.04 275.00 -6.00 0.00 0.00 0.00 0.00 SSEP/125 SSEP/126 164.04 276.00 3.00 0.00 0.00 0.00 0.00 SSEP/126 SSEP/127 164.04 280.00 8.00 0.00 0.00 0.00 0.00 SSEP/127 SSEP/128 164.04 279.00 10.00 0.00 0.00 0.00 0.00 SSEP/128 SSEP/129 164.04 262.00 6.00 0.00 0.00 0.00 0.00 SSEP/129 SSEP/130 164.04 273.00 -8.00 0.00 0.00 0.00 0.00 SSEP/130 SSEP/131 164.04 280.00 -4.00 0.00 0.00 0.00 0.00 SSEP/131 SSEP/132 164.04 263.00 7.00 0.00 0.00 0.00 0.00 SSEP/132 SSEP/133 143.04 250.00 8.00 0.00 0.00 0.00 0.00 SSEP/133 SSEP/134 164.04 262.00 -4.00 0.00 0.00 0.00 0.00 SSEP/134 SSEP/135 164.04 260.00 -7.00 0.00 0.00 0.00 0.00 SSEP/135 SSEP/136 164.04 261.00 -8.00 0.00 0.00 0.00 0.00 SSEP/136 SSEP/137 164.04 277.00 -2.00 0.00 0.00 0.00 0.00 SSEP/137 SSEP/138 164.04 305.00 3.00 0.00 0.00 0.00 0.00 SSEP/138 SSEP/139 164.04 278.00 6.00 0.00 0.00 0.00 0.00 SSEP/139 SSEP/140 148.29 284.00 7.00 0.00 0.00 0.00 0.00 SSEP/140 SSEP/141 159.45 297.00 2.00 0.00 0.00 0.00 0.00 SSEP/141 SSEP/142 164.04 227.00 4.00 0.00 0.00 0.00 0.00 SSEP/142 SSEP/143 90.22 200.00 -1.00 0.00 0.00 0.00 0.00 SSEP/143 SSEP/144 164.04 203.00 -6.00 0.00 0.00 0.00 0.00 SSEP/144 SSEP/145 129.59 254.00 -5.00 0.00 0.00 0.00 0.00 SSEP/145 SSEP/146 164.04 302.00 -11.00 0.00 0.00 0.00 0.00 SSEP/146 SSEP/147 164.04 317.00 0.00 0.00 0.00 0.00 0.00 SSEP/147 SSEP/148 164.04 319.00 2.00 0.00 0.00 0.00 0.00 SSEP/148 SSEP/149 164.04 318.00 6.00 0.00 0.00 0.00 0.00 SSEP/149 SSEP/150 164.04 315.00 10.00 0.00 0.00 0.00 0.00 SSEP/150 SSEP/151 85.30 287.00 5.00 0.00 0.00 0.00 0.00 SSEP/151 SSEP/152 164.04 246.00 -8.00 0.00 0.00 0.00 0.00 SSEP/152 SSEP/153 164.04 202.00 -6.00 0.00 0.00 0.00 0.00 at junction to quarry. SSEP/153 SSEP/154 262.47 330.00 0.00 0.00 0.00 0.00 0.00 shot up the quarry road.