*title overseer *BEGIN overseer *export 1 *export 108 ;*export 119 ;*export 120 *export 86 *CALIBRATE COMPASS 8 *Date 1981 *DATA NORMAL FROM TO BEARING LENGTH GRADIENT remarks *units tape feet ;Branch to Overseer and Queens shaft in Masson Mine from sta 169 youds level survey. *fix 119 28979 59278 236.11 ;oversheer shaft *fix 120 28870 59148 272.00 ;queen shaft *entrance 119 *entrance 120 1 2 - 7.5 Up ;From main passage in Youds Level Sta 169 this is the branch to Overseer Shaft, Queens Shaft and Masson Mine 2 3 154 9.5 0 ;Sta 2 top of climb up 3 4 228 19 +13 4 5 238 9 +2.5 5 6 176 12.5 +45 6 7 200 13 +11 7 8 - 2.5 UP 8 9 258 14 +11 9 10 201 9 +6 ;Cross over passage to Jigging box. 10 11 197 15 +8 ;Side passage to climbing shaft workings 11 12 215 6.6 +8 12 13 220 23 +8 13 14 216 23 +10 14 15 220 22 +12 15 16 216 24 +14 16 17 221 10 +22.5 17 18 210 14 +32 18 19 233 38 +11 ;side passage 19 20 278 19 +1 ;side passage may have been main line 20 21 256 16 +11 21 22 208 11.5 +16 22 23 173 13 +8.5 23 24 200 7 +15 24 25 195 8 +3 25 26 190 14 +1.5 ;Dig site connection very low 26 27 165 8 +5 ;side passage 27 28 219 18 +13 28 29 128 11 +45 29 30 212 15 +26 30 31 - 4.5 Up 31 32 220 11 +25 32 33 222 11 -5.0 33 34 220 11 -15 34 35 220 2.5 0 35 36 - 4.5 Up 36 37 215 13 +15 37 38 220 45 +34 ;Sta 37 plus 5.00 is base of Overseer shaft and chamber 38 39 228 18 +21 39 40 231 20 +1.5 40 41 230 29 +1.5 41 42 256 16 +2.5 42 43 225 22 +13 ;Stope in roof in front of sta 45 43 44 200 9 +5 44 45 232 22 +18 45 46 229 22 +13.5 46 47 - 3.25 Up 47 48 229 10 0 48 49 - 3.25 Up 49 50 236 24 +29 50 51 230 50 +27 51 52 229 18 +9.5 52 53 208 11 +17 53 54 231 6 +32 54 55 223 25 -5 55 56 245 13 +8 56 57 212 8 +11.5 57 58 228 20 +23 58 59 195 6 0 ;sta 59 start of climb up to entrance to stope 59 60 228 15 0 ;side passage ends in rubble and water 59 61 - 17.5 Up 61 62 145 5 0 62 63 - 2.0 Up 63 64 48 10 -2 ;side passage forefield 63 65 211 13 0 65 66 - 10.0 Up 66 67 211 5 0 67 68 - 12 Up 68 69 217 32 +31 69 70 - 9.75 Up 70 71 217 12 +20 71 72 - 13 Up 72 73 235 16 +17 73 74 - 4.5 Down 74 75 235 43 +22 75 76 308 25 0 ;side passage 75 77 222 31 +15 77 78 222 11 +8 78 79 222 5 0 79 80 - 17 Down 80 81 229 12 -25 81 82 - 8 Down 82 83 229 6 0 83 84 210 14 -2 84 85 247 9 0 85 86 235 16 0 ;Queens shaft bottom 38 87 228 5 +21 87 88 140 8 0 ;Overseer shaft base 37 89 135 12 +3 89 90 45 20 0 ;tee junction 89 91 228 15 +2 89 92 82 8 0 40 93 230 19 +1.5 93 94 300 16 0 93 95 130 10 0 44 96 150 46 -3 49 97 115 10 -2 19 98 170 7 +3 ;side passage may have been main line. 98 99 195 10 +4 99 100 215 32 +8 100 101 - 4 Up ;Backfilled bedding plane 26 102 90 10 0 ;low passage backfilled 18 103 310 24 -4 ;side passage at top of left hand branch passage towards main passage boulder pile 103 104 335 12 -2 10 105 277 14 +22 ;Passage to climbing shaft workings 105 106 262 8 0 106 107 235 7 0 107 108 - 40 Up 9 109 2 13 +23.5 ;Cross over passage to Jigging box. 109 110 325 15 -19.5 110 111 322 6.5 -46.5 111 112 349 5.5 -14 112 113 20 4.5 0 113 114 - 9.67 Down 37 115 220 5.00 +34 115 116 130 27.00 +80 ;top of stope and entrance to shaft propper. 116 117 - 20.00 up 117 118 10 15.00 +1 ;Level off in shaft to Forefield. 117 119 - 160.00 up ;Top of Overseer shaft. At 71.00 from surface shaft section turns through 90 degs. 86 120 - 196.00 up ; Approximate depth of Queens shaft *data passage station up down left right *units tape feet 1 4.80 4.80 2.50 0.00 2 2.00 0.00 4.00 4.70 3 2.50 2.50 4.00 4.00 4 2.80 2.90 2.50 2.50 5 2.50 2.50 1.50 1.50 6 2.50 2.50 1.25 1.25 7 2.00 2.00 2.25 2.25 ;step up in passage 8 2.00 2.00 2.25 2.25 9 2.00 2.00 1.50 1.50 ;Cross over passage to Jigging box. 10 1.80 1.80 1.20 1.20 ;Side Passage to Climbing shaft workings 11 1.80 1.80 1.20 1.20 12 1.75 1.75 1.20 1.20 13 1.25 1.25 5.00 5.00 14 2.25 2.25 5.50 5.50 15 3.00 3.00 2.50 2.50 16 2.25 2.25 5.00 5.00 17 1.80 1.80 3.50 3.50 18 3.50 3.50 5.00 5.00 19 1.00 1.00 1.50 1.50 ;side passage 20 2.25 2.25 1.50 1.50 21 1.42 1.42 2.00 2.00 22 1.50 1.50 4.00 4.00 23 1.75 1.75 1.25 1.25 24 1.50 1.50 1.25 1.25 25 1.00 1.00 2.25 2.25 ;Start of the connection Crawl. 26 0.70 0.70 2.00 2.00 27 0.70 0.70 1.50 1.50 28 0.70 0.70 1.50 1.50 29 1.00 1.00 2.50 2.50 ;End of the Connection Crawl. 30 1.25 1.25 2.25 2.25 ;climb up 4.5 into Overseer Chamber. 31 5.00 0.00 1.50 1.50 ;Start of Overseer Chamber. 32 7.00 0.00 4.00 4.00 33 10.00 0.00 6.50 6.50 34 10.00 0.00 7.50 7.50 35 4.50 0.00 7.50 7.50 ;4.5 step up. 36 10.00 0.00 7.50 7.50 37 12.00 0.00 7.00 7.00 ;Sta 37 plus 5.00 is overseer shaft 38 12.00 0.00 1.75 1.75 39 10.00 0.00 3.50 3.50 40 11.0 0.00 2.00 2.00 41 4.0 0.00 3.00 3.00 42 3.75 0.00 4.50 4.50 43 4.00 0.00 3.50 3.50 44 3.50 0.00 2.50 2.50 45 4.00 0.00 3.50 3.50 46 3.50 0.00 3.50 3.50 ;rise 47 3.50 0.00 3.50 3.50 48 4.00 0.00 3.00 3.00 ;rise 49 6.00 0.00 3.50 3.50 50 6.00 0.00 2.50 2.50 51 4.00 0.00 2.00 2.00 52 4.00 0.00 1.75 1.75 53 10.00 0.00 1.50 1.50 54 8.00 0.00 2.00 2.00 55 5.00 0.00 2.00 2.00 56 2.75 0.00 1.50 1.50 57 6.00 0.00 2.25 2.25 58 6.00 0.00 2.50 2.50 59 6.50 0.00 2.50 2.50 ;59 rise 61 2.00 0.00 2.00 1.00 62 3.50 0.00 2.00 1.50 ;62 rise 63 3.25 0.00 2.25 1.25 65 3.00 0.00 3.00 2.50 66 4.50 0.00 3.50 2.00 67 4.00 0.00 3.00 2.50 68 5.00 0.00 3.50 3.00 69 5.00 0.00 3.00 3.50 70 4.00 0.00 4.00 4.50 71 4.00 0.00 3.50 3.50 72 4.50 0.00 2.50 2.00 73 4.00 0.00 2.75 3.00 74 4.50 0.00 2.00 2.25 75 5.00 0.00 2.00 2.00 77 5.00 0.00 2.50 2.00 78 4.50 0.00 2.00 2.50 79 4.00 0.00 3.00 2.00 80 4.75 0.00 2.50 2.00 81 4.50 0.00 2.00 2.50 82 5.00 0.00 2.50 1.00 83 4.75 0.00 2.00 1.50 84 5.00 0.00 3.00 2.50 85 4.50 0.00 2.50 2.00 86 5.50 0.00 5.00 4.00 ;Queens shaft bottom. 120 - - 5.00 4.00 *data passage station up down left right *units tape feet 115 3.00 0.00 7.00 7.00 ;overseer shaft 116 0.00 0.00 5.00 5.00 117 2.00 0.00 2.00 2.00 119 3.00 0.00 2.00 2.00 *data passage station up down left right *units tape feet 10 1.80 1.80 1.20 1.20 ;passage to climbing shaft workings 105 2.00 2.00 1.50 1.50 106 1.50 1.50 1.25 1.25 107 1.50 1.50 1.00 1.00 108 - - 1.50 1.50 *data passage station up down left right *units tape feet 9 2.00 2.00 1.50 1.50 ;cross over passage to jigging box 109 1.25 1.25 2.50 2.50 110 1.50 1.50 2.25 2.25 111 1.50 1.50 2.50 2.50 112 1.75 1.75 1.00 1.00 113 1.75 1.75 1.25 1.25 114 - - 2.00 2.00 *data passage station up down left right *units tape feet 26 0.70 0.70 2.00 2.00 ;side passage near connetion dig site 102 0.50 0.50 2.25 1.25 *data passage station up down left right *units tape feet 19 1.00 1.00 1.50 1.50 ;side passage may have been main line. 98 1.25 1.25 1.25 1.50 99 1.00 1.00 1.25 1.25 100 1.00 1.00 1.25 1.25 101 - - 1.25 1.25 *data passage station up down left right *units tape feet 18 3.50 3.50 3.00 3.00 103 2.25 2.00 3.00 1.50 104 2.00 1.00 2.00 1.00 *end overseer