*BEGIN yatestoop_sough *title "Yatestoop sough" *CALIBRATE COMPASS 6.5 *DATA NORMAL FROM TO BEARING LENGTH GRADIENT REMARKS *cs EPSG:27700 *cs out EPSG:27700 ;* FIX 1 000000 000000 0000 ;*fix 52 26389 62591 94 ;*fix 1a 425993 362434 119 ;alice shaft ;*fix 1a 425840 362382 119 ;alice shaft (bearings from John Barnett) *fix 1a 25876 62365 119 ;alice shaft (bearings from Phil W) ;*fix ? 425874 362364 ;Warrencarr shaft SK25874 62364 *entrance 52 *entrance 1a 1a 1 - 19.900 Down ;Allice Shaft 1 2 111.0 5.00 -9.0 2 3 75.00 9.00 -2.0 3 4 48.00 6.40 -1.0 4 5 24.00 8.00 -1.0 ;inscription at 5 (001 Tiny) 5 6 165.00 17.00 +1.0 6 7 137.00 11.5 +0.5 ;8mt from Sta 6 side passage to Warrencarr Shaft 7 8 165.00 11.5 +1.0 8 9 224.00 2.00 +6.0 9 10 300.00 3.00 +5.0 ;Warrencarr Shaft 5 11 345.00 6.50 -0.5 11 12 002.00 5.30 -0.5 12 13 337.00 19.00 -0.5 13 14 283.00 1.500 -0.9 14 15 259.00 18.00 +0.5 ;sta 13 junction and shaft in roof with water decending 15 16 252.00 13.00 +0.5 ;shaft on right in roof 1.2 x 0.6 10mts up to blockage 16 17 261.00 22.00 +0.5 17 18 252.00 18.00 +0.5 18 19 262.00 9.00 +0.5 ;8mts from Sta18 shaft on left in roof 1.2 x 0.6 12mts up to blockage. 19 20 253.00 15.50 +0.5 20 21 252.00 13.00 +0.5 ;Sta21 dig site and water up to roof. 13 22 52.00 2.00 -0.5 22 23 77.00 13.00 -0.5 23 24 75.00 16.00 -0.5 24 25 74.00 8.00 -0.5 25 26 82.00 15.5 -0.5 26 27 83.00 8.50 -0.25 27 28 98.00 11.50 +0.5 28 29 48.00 4.00 0.00 ;Sta28 side passage to small chamber 28 30 105.00 19.00 -0.5 30 31 111.00 11.00 -0.5 31 32 99.00 10.5 -1.0 32 33 105.00 19.00 -0.5 33 34 110.00 11.00 -0.5 34 35 72.00 14.00 -0.5 35 36 65.00 10.00 -0.5 36 37 69.00 5.50 -0.5 37 38 63.00 7.50 -0.5 38 39 71.00 18.00 -0.5 39 40 70.00 22.00 -0.5 40 41 67.00 22.00 -0.5 41 42 67.00 11.50 -0.5 42 43 77.00 19.00 -0.5 43 44 75.00 22.00 -0.5 ;3.7mts along 22mt leg from sta44passing bay on right and another at 9.4mts same side 44 45 74.00 22.00 -0.5 45 46 76.00 17.00 -0.5 ;12.0mts along 17mt leg passing bay on right 46 47 79.00 10.00 -0.5 47 48 80.00 14.00 -0.5 48 49 77.00 20.00 -0.5 49 50 79.00 20.00 -0.5 50 51 82.00 8.50 -0.5 51 52 69.00 7.00 -0.5 ;sta 52 sough tail portal 52 53 69.00 10.00 0.00 ;open ditch to river from sta 52 portal to sta 53 river derwent. 6 54 137.00 8.00 +1.0 ;Side passage to Warrencarr shaft 54 55 160.00 13.00 0.00 55 56 220.00 2.00 0.00 *data passage station up down left right 1a 1.6 1.60 2.10 2.10 1 0.85 0.85 0.45 0.45 2 0.85 0.85 0.45 0.45 3 0.90 0.90 0.40 0.40 4 0.90 0.90 0.40 0.40 5 1.10 1.10 0.60 0.60 6 1.25 1.25 0.45 0.45 7 0.70 0.70 0.45 0.45 8 0.55 0.55 0.40 0.40 9 0.55 0.55 0.40 0.40 10 0.55 0.55 0.40 0.40 *data passage station up down left right 5 1.10 1.10 0.30 0.30 11 1.20 1.20 0.60 0.60 12 1.25 1.25 0.45 0.45 13 1.50 1.50 0.50 0.50 14 0.55 0.55 0.30 0.30 15 0.65 0.65 0.30 0.30 16 0.60 0.60 0.30 0.30 17 0.65 0.65 0.50 0.50 18 0.60 0.60 0.30 0.30 19 0.45 0.45 0.50 0.50 20 0.50 0.50 0.65 0.65 21 0.50 0.50 0.75 0.75 *data passage station up down left right 13 1.50 1.50 0.50 0.50 22 0.55 0.55 0.30 0.30 23 0.80 0.80 0.30 0.30 24 0.60 0.60 0.25 0.25 25 0.55 0.55 0.25 0.25 26 0.65 0.65 0.25 0.25 27 0.55 0.55 0.25 0.25 28 0.65 0.65 0.30 0.30 30 0.65 0.65 0.40 0.40 31 0.65 0.65 0.35 0.35 32 0.65 0.65 0.35 0.35 33 0.75 0.75 0.45 0.45 34 1.05 1.05 0.45 0.45 35 1.15 1.15 0.45 0.45 36 1.15 1.15 0.45 0.45 37 1.15 1.15 0.45 0.45 38 1.15 1.15 0.45 0.45 39 1.0 1.0 0.45 0.45 40 1.15 1.15 0.45 0.45 41 1.15 1.15 0.45 0.45 42 1.15 1.15 0.45 0.45 43 1.15 1.15 0.45 0.45 44 1.10 1.10 0.45 0.45 45 1.15 1.13 0.35 0.35 46 1.20 1.20 0.35 0.35 47 1.20 1.20 0.35 0.35 48 1.20 1.20 0.25 0.25 49 1.15 1.15 0.30 0.30 50 1.15 1.15 0.30 0.30 51 1.15 1.15 0.30 0.35 52 1.15 1.15 0.40 0.40 *data passage station up down left right 28 0.65 0.65 0.30 0.30 29 0.65 0.65 0.30 0.30 *data passage station up down left right 6 1.25 1.25 0.45 0.45 54 0.70 0.70 0.45 0.45 55 0.65 0.65 0.50 0.50 56 0.70 0.70 0.80 0.80 *END yatestoop_sough