encoding utf-8 survey Winbeysewer -title "Winnatts head Cave:
Beyond the Sewer" input Winbeysewer.th2 map WinbeysewerMP BeysewerSP1 BeysewerSP2 BeysewerSP3 endmap centreline #begin ;PeteWard's survey Down from Fox chamber, through sewer and to terminal Sump. #date 1988.08.14 #team "Pete Ward" #team "Mark Loftus" #team "P. Boardman" #PeteWard applied a 7deg compass correction to all his legs #calibrate compass -7 FC5 2 4.3 256 -36 #Starts from JB's station 5 which was top of biggest boulder at bottom of Fox Chamber 2 3 4.8 132 -56 3 4 4.2 25 -39 4 5 2.8 86 -46 5 6 2.5 184 -27 6 7 2.8 261 -49 7 8 0.8 269 0 8 9 3.6 0 -90 9 10 3.1 352 4 10 11 2.6 0 -90 11 12 0.7 20 -22 12 13 2.8 76 -27 13 14 2.4 124 15 14 15 3 194 -55 15 16 1.2 247 -56 16 17 1.1 0 -90 17 18 3.8 82 -51 18 19 4.1 104 -28 #shot across static sump "this is the sea" 18 20 3.7 20 -11 20 21 6.6 306 -8 21 22 2.4 308 -12 22 23 3.6 298 -21 23 24 1.4 293 -38 24 25 5.8 312 0 #Through the Sewer 25 26 1 0 90 26 27 1.9 314 21 27 28 2.3 311 -1 28 29 5 305 -27 29 30 0.8 0 -90 28 33 5.7 71 69 33 34 4.4 0 90 34 35 5.6 291 54 35 36 1.8 352 49 36 37 4.9 358 29 37 39 3 11 28 39 40 4.6 20 25 40 41 3 332 -4 41 42 3.6 302 -6 42 43 5.7 302 -4 43 44 3.2 252 -27 #43 is where upstream pitches go from 44 45 2.6 316 3 45 46 3 317 -13 44 47 2.1 281 -15 47 48 10 303 -65 48 49 7.1 162 -24 49 50 2.7 0 -90 50 51 5.8 339 -30 51 52 4.2 288 -39 52 53 11.4 0 -90 53 54 2.5 309 -36 54 55 12.3 290 -37 55 56 7 262 -42 56 57 2.2 264 -49 57 58 7 0 -90 58 59 2.4 275 -22 59 60 4.2 0 -90 60 61 5 124 0 60 62 1.2 206 -36 62 63 4 161 -61 63 64 3.5 164 0 #63 is terminal sump endcentreline endsurvey