;Cave: Notts II - Inlet5 ;Description: Inlet 5 main passage to sump ;Date: 19/03/05 ;Surveyors: Instruments: Tania Milnes, Tony Bennison; Notes: Tanya Savage ;Instruments: Neil's kit *begin Inlet5-1 *date 2005.03.19 *export 001 *export 019 ;From To Tape Compass Clino L R U D Comments 001 002 14.25 233 +3 ;0 2 1.3 1 Stn 1 drilled hole on left wall of inlet5 002 003 13.07 190 +2 ;2 0 0.3 1 Stn 2 RH wall 003 004 13.0 271 -2 ;0 1.5 0.5 1.7 Stn 3 LH wall 004 005 6.06 212 +2 ;1.5 0 1 1 Stn 4 005 006 6.00 292 -3 ;0 2 0.5 1.4 Stn 5 006 007 19.40 243 0 ;1.3 0.3 1 1 Stn 6 007 008 9.71 254 +5 ;2 1 1.3 1 Stn 7 008 009 10.20 211 +0.5 ;2.2 0 1 1.3 Stn 8 009 010 6.90 226 -2 ;0 2 0.4 1.7 Stn 9 010 011 10.10 203 -9 ;1.2 0.7 0 1.5 Stn 10 011 012 16.42 196 +5 ;1 2 1.5 0.5 stn 11 012 013 30.33 255 +3 ;0 2 0.5 1.5 Stn 12 013 014 19.95 274 0 ;0 1.8 1 1.5 Stn 13 014 015 5.81 295 -5 ;2 0.5 0.5 1.5 Stn 14 015 016 4.26 233 +10 ;1.5 0.2 1 1.5 Stn 15 016 017 6.63 271 -1 ;0.5 1.8 0.7 1.7 Stn 16 017 018 3.43 232 -7 ;1.2 1 1.2 1.7 Stn 17 018 019 4.98 300 +7 ;0.5 2 1.2 1.5 Stn 18 ; Stn 19 Roof LH wall opposite flake marked with triangle, ; next to passage junction, sump to left *end Inlet5-1