; Locn: Leck Fell ; Cave: Notts II ; Green Tape InletInlet *begin GreenTape_1 *export 1 *title "GreenTape" *date 2012.02.13 *team Insts Richard Bendall *team tape Ruth MacDonald *team Notes Dave Ramsay *instrument Compass and Clino - RR2 *calibrate tape 0.0 ; +ve if tape was too short, -ve if too long ;commented out by Simon Cornhill 2019.04.27 as it is superseded by *declination auto in leckfell.svx ;*calibrate declination +2.43 ;RGB calculated mag decl from http://www.ngdc.noaa.gov/geomagmodels/struts/calcDeclination ;54.1994n 2.5124w 2012.02.13 *data normal from to tape compass clino ;from to tape compass clino remarks 1 2 6.40 342 +40 2 3 7.77 077 +9 3 4 16.70 090 -1 4 5 5.21 091 +6 5 6 3.46 084 -1 6 7 2.95 045 +7 7 8 3.22 017 -5 8 9 4.34 030 -3 ;Check 9 10 8.83 100 -1 10 11 7.43 090 +5 11 12 5.54 065 0.0 12 13 5.55 054 +2 13 14 9.26 065 +4 14 15 10.31 087 0.0 15 16 5.33 022 -1 16 17 5.43 086 +2 17 18 1.89 069 0.0 18 19 3.56 355 -8 19 20 4.87 007 +1 20 21 3.20 305 -3 20 22 2.13 017 -8 22 23 2.80 286 -8 23 21 1.22 208 +3 22 25 5.10 010 -2 25 26 3.08 010 +3 26 27 2.73 056 0.0 27 28 3.19 329 -1 28 29 1.41 246 0.0 ;needs checking again 29 30 3.97 042 +3 30 31 1.55 054 +20 31 32 2.45 048 +70 8 33 6.4 258 -1 33 34 2.79 282 +1 34 4 5.30 212 +5 *data passage station left right up down ignoreall 1 0.8 0.0 7.2 1.3 ;Tag in mainstreamway 2 1.0 2.5 3.0 1.5 ;LH Wall opp. entrance 3 1.2 1.2 0.5 1.0 ;Boulder 4 2.0 0.5 0.2 0.5 ;on stall at jn 5 0.2 0.6 0.5 0.2 ;roof 6 0.8 1.0 0.2 0.15 ;column 7 1.0 0.8 0.1 0.3 ;tip of curtain 8 2.3 2.0 0.0 0.27 ;roof 9 1.0 2.2 0.2 0.4 ;stall tip 10 1.8 0.8 0.6 0.4 11 0.5 2.0 0.8 0.8 ;airbell 12 1.3 1.2 0.4 0.6 ;stall 13 1.0 0.7 0.5 0.4 ;column 14 0.5 1.8 0.0 1.1 15 1.5 0.4 0.0 0.8 ;roof 16 0.3 1.3 0.3 0.7 ;stall 17 1.8 1.0 2.6 0.3 ;boulder 18 1.3 0.4 2.2 0.5 ;roof 19 1.8 0.9 0.5 0.3 ;boulder at jn 20 0.4 0.5 0.1 0.4 ;in roof 21 0.3 0.3 0.1 0.5 ;in roof 22 0.8 1.5 0.4 0.3 23 0.4 0.1 0.5 0.0 ;24 there is no 24! 25 0.8 0.3 0.3 0.4 ;RH Wall 26 0.25 1.6 0.1 0.7 ;roof 27 0.9 1.2 0.1 0.5 ;roof 28 0.7 0.3 0.1 0.5 ;roof 29 0.4 0.4 0.1 0.5 30 1.3 1.0 0.1 0.5 ;rib in roof 31 0.8 0.6 3.0 0.0 ;floor 32 0.0 0.8 2.0 2.0 ;LH Wall 0.95 above scaff 33 0.0 2.2 0.2 0.3 ;LH Wall 34 1.0 1.0 0.2 0.3 *end GreenTape_1