*begin N2MD ;Date: 26/10/2006 ;Cave: Notts II ;Survey Kit RRCPC No ? ;Instruments: Dave Ramsay ;Book: Neil Pacey ;Tape: Richard Bendall ;Tape started at -10 centimetres (original notes - no Corrections) ;Dome Inlet Tag to upstream maindrain of Inlet 7 *Title "Main Drain" *export 1 ;Jimlet1 *export 6 ;equates to Inlet 7, OL1.001 *export 8a ;Inlet 8 *export 11 ;Nickpoint Bridge with stall boss - start of Estonia *export 24 ;Tag at Inlet 9 - Dome Inlet, N06.001 *CALIBRATE tape -.10 ;Tape was 10 centimetres too long ;Station Tape Compass Clino L R U D 1 2 18.00 072 0 ;0.1 2.4 8.0 1.8 stn 1 True Left 8mm drill hole 2 3 8.22 012 +1 ;2.5 0.4 5.0 1.7 3 4 10.70 070 -3 ;0 2.5 4.5 1.7 4 5 8.47 007 +1 ;2.5 3.0 5.0 1.3 5 6 19.14 047 -1 ;3.0 1.0 5.0 1.2 6 7 8.75 353 -13 ;2.5 1.0 4.0 1.7 stn 6 Start of Inlet 7 7 8 7.00 324 +0 ;3.0 1(6) 4.0 1.2 8 8a 10.40 237 +17 ;4.5 1.0 6.0 1.0 stn 8a up mud slope into Inlet 8 mark in roof 8 9 11.12 017 0 ; 9 10 19.20 057 -2 ;4.0 2.0 6.0 1.0 10 11 14.65 351 -5 ;4.0 0 7.0 2.0 11 12 5.50 000 -7 ;2.5 3.0 5.0 1(3) stn 11 Stall Boss on Bridge opposite start of Estonia 12 13 7.43 285 -2 ;1.5 0 6.0 1.7 13 14 6.15 229.5 0 ;0.5 0 2.5 1.0 14 15 3.93 275 -4 ;0 1.0 6.5 1.8 15 16 8.52 350 -6 ;0.1 1.0 6.0 1.9 16 17 3.20 316 -3 ;0.3 1.0 6.0 1.6 17 18 4.70 352 -7 ;0 0.4 6.0 1.7 18 19 5.08 327 -3 ;0.1 0.5 6.5 1.6 19 20 9.24 341 -2 ;0.5 0 6.5 1.7 20 21 4.13 315 -3 ;0.1 0.3 7.0 1.6 21 22 4.43 015 -5 ;0.4 0.6 7.0 0.1(1.5) 22 23 2.95 326 -7 ;0.5 0.1 7.0 1.6 23 TAG 0.5 080 0 ;0.1 0.4 7.0 1.6 stn TAG tag at entrance to Dome Inlet *end N2MD