*begin Inlet17_1 ;Date: 16/10/2006 ;Cave: Notts II - Inlet 17 ;Survey Kit RRCPC No ? ;Instruments: Richard Bendall ;Book: Neil Pacey ;Tape: Dave Ramsay ;Tape started at -10 centimetres (original notes - no Corrections) *Title "Inlet 17" ;equate 12 Inlet17_2.1 *export 1 *export 12 *export 33 *export 45 *CALIBRATE tape -.10 ;Tape was 10 centimetres too long ;Station Tap Compass Clino L R U D 1 2 2.90 010 -1.5 ; 1 =tag at Green Tape Inlet 2 3 2.10 324 -13 ;1.5 0 6 1.3 3 4 5.06 344 -3 ;1.0 0 0.5 1.0 3=RHwall below dribbly flow stone 4 5 1.90 309 -8 ;1.0 0 6 1.8 5 6 5.10 246 -5 ;0.5 0 7 1.3 6 7 7.55 306 -2 ;0 1.3 8 1.3 7 8 3.20 272 -21 ;1.0 0.2 8 2.5 8 9 10.35 252 -9 ;0.1 0.8 9 1.6 9 10 1.85 - down ;0.1 1.1 9.5 1.9 Climb down into Kleine Scheldeg 10 11 5.65 309 -10 ;0.6 3.3 10 1.6 11 12 5.60 199 -22 ;3.2 0 11 1.8 12 13 4.90 118 +22 ;2.5 1.0 11.5 1.0 13 14 10.30 - up ;0.6 2.2 12 1.7 Up pitch into Notts II.II 14 15 4.00 154 +22 ;2.0 1.5 2.5 12.0 15 16 5.40 212 +3 ;0.1 2.0 0.4 0.5 16 17 10.95 264 0 ;0.3 1.3 0.5 1.2 17 18 11.25 235 -1 ;1.7 0.5 0.5 1.0 18 19 9.05 271 +2 ;0.7 2.0 0.6 1.3 19 20 6.75 245 0 ;1.3 0.9 0.4 1.4 20 21 3.95 225 -1 ;1.3 1.6 1 1.3 21 22 6.70 289 -9 ;2.0 0.6 0.6 1.6 22 23 6.45 240 -33 ;0.6 1.2 2.5 1.8 22=Near bolt for hand line 23 24 3.60 323 +25 ;0.4 0 4.0 1.0 through window *equate 24 30 ;stn24=stn30 there are no stns25-29 24=Bolt in roof 30 31 10.0 270 -36 ;1.0 0 0.1 1.6 31 32 4.40 267 -25 ;2.0 0 3.5 0.2 32 33 4.00 328 -57 ;0.1 1.6 3.0 1.8 33 marked bottom of mud slope into Inlet 17 33 34 6.10 256 -7 ;2.0 0 7.0 1.7 Upstream Inlet 17 34 35 5.50 206 0 ;1.7 0.1 0.4 0.6 35 36 8.85 134 0 ;2.0 0 0.2 0.8 36 37 4.40 222 +5 ;0 2.0 1.5 0.5 37 38 4.45 196 +1 ;1.0 1.0 0.3 1.2 38 39 12.70 273 +2 ;0.1 1.5 0.4 1.2 39 40 8.95 182 +4 ;1.5 0.1 1.0 1.0 40 41 13.60 280 -1 ;0.1 1.6 0.5 1.3 *equate 41 44 ;Stn41=stn44 there are no stations 42-43 44 45 8.60 230 +4 ;1.2 0 0.4 1.0 Stn 41&44same 45 46 10.00 315 0 ;0 1.3 0.4 1.2 10m estimate into sump *end Inlet17_1