;Cave: Ireby Fell - pitch alternatives ;Surveyors: D.Ramsay/S.Jobling/R.Bendall ;Date: 04/05/06 ;Instruments: RRCPC Kit 2 *equate If14.001 If01.001 *equate If14.215 If01.027 *equate If14.007 If01.007 *begin If14 *export 001 *export 215 *export 007 *calibrate compass +5.00 001 002 00.70 203.0 00.0 ;stn001 is drilled hole in big rock start of 2/4/06 survey 002 003 04.30 312.0 -53.5 ;down ent tube 003 004 06.30 338.0 -28.0 004 005 05.20 322.0 -29.0 ;rock projection by inlet on L 006 005 03.73 241.0 +26.0 006 007 03.73 028.0 -44.0 ;stn007 is normal 1st bolt 008 007 05.20 250.0 +51.0 009 008 01.85 254.0 +03.0 ;stn009 is 4th bolt 010 009 01.13 228.0 +11.0 ;stn10 is y hang 011 010 02.78 253.0 +03.0 ;stn11 is y hang of shadow route 011 012 03.62 - DOWN ;stn12 is level with bolt on shadow route 013 012 01.59 336.0 00.0 ;stn13 is bolt on shadow route 013 014 03.10 - DOWN ;stn14 is on rope level with 1st bolt on overshadow route 015 014 03.73 047.0 -11.0 ;stn15 is 2nd bolt on overshadow route 102 005 02.64 216.0 +37.0 ;start of 04/05/06 survey 102 103 02.70 - DOWN ;start of Bubbles Route 104 103 01.10 057.0 +22.0 105 104 01.30 117.0 +19.0 106 105 02.40 050.0 +41.0 107 106 04.90 220.0 +43.0 ;suspect reading of 231.0 108 107 02.50 014.0 +20.0 109 108 02.70 254.0 +14.0 110 109 02.80 337.0 +18.0 110 111 02.30 - DOWN 112 111 02.50 057.0 -01.0 108 114 01.70 104.0 -18.0 ;start of alternative route 114 115 04.60 155.0 -52.0 115 112 01.10 232.0 -18.0 ;end of alternative route 112 202 01.50 272.0 -03.0 ;start of 08/05/06 survey 202 203 01.57 238.0 -05.0 203 204 01.78 321.0 +00.5 204 205 05.80 247.0 -37.0 205 206 02.88 301.0 +22.0 206 207 02.20 278.0 -21.0 207 208 24.45 - DOWN 208 209 03.40 344.0 +00.5 209 210 05.00 - DOWN ;into chamber of dark sound 210 211 05.90 290.0 -24.0 ;stn211 is wall opposite ent to cods at junction of ways 211 212 06.43 185.0 -44.0 ;stn212 stream enters on left 212 213 04.67 166.0 -08.0 ;stn213 stream sinks to left 213 214 01.70 169.0 +27.0 214 215 09.60 105.5 +04.0 ;tag on true L wall junc with two routes from Pussy chamber 214 252 01.70 353.0 -22.0 ;start of 08/06/06 survey into Passage of Dark Slime 252 253 02.30 060.0 -23.0 ;stn252 is start of Pass of Dark Slime 253 254 04.40 072.0 -03.0 254 255 03.25 316.0 -01.0 255 256 02.60 350.0 -03.0 256 257 02.05 337.0 -10.0 ;end of Passage of dark Slime at sump 211 262 02.75 112.0 +10.0 ;chamber of dark sound survey 262 263 02.55 154.0 -21.0 263 264 03.35 207.0 -48.0 ;Stream presumably flows to stn212 211 265 04.95 256.0 +18.0 ;start of route up into overshadow 265 266 01.90 - UP ;stn266 is hole in floor 266 267 09.00 238.0 +04.0 ;stn267 is at rope up at head height 267 268 03.35 - UP 269 268 02.75 344.0 -04.0 269 270 00.45 135.0 00.0 ;stn270 is foot of ladder/rift climb at head height 270 271 04.50 - UP 271 272 02.10 147.0 +18.0 ;under loose blocks 272 273 01.10 - UP 273 274 06.60 140.0 +39.0 274 275 06.20 139.0 +14.0 ;stn275 is wall to right of rope down 275 276 03.45 085.0 00.0 276 277 02.35 - DOWN 277 278 09.10 061.0 -12.0 ;stn278 is bottom of rope up *end If14