;Cave: Wretched Rabbit - from first tag at Cross Rift into Parallel Streamway then upstream ;Surveyors: R.Duffy/A.Whitney/H.St.Lawrence ;Date: 07/010/03 ;Instruments: PAG *equate wr16.001 wr.038 ;cross rift to parallel streamway *equate wr16.004 wr17.001 *begin wr16 *export 001 *export 004 *calibrate compass +3.50 ;*calibrate compass +5.00 ;recalibrated *calibrate clino +1.5 *calibrate tape +0.075 *fix 033 67599.89 80714.54 291.89 ;edge of sheet 3c 001 002 02.50 - UP ;tag=wr.038 in streamway 002 003 02.10 001.5 +17.0 003 004 03.31 336.0 -27.5 ;st004 is x on wall 40cm above cable tie in parallel streamway 004 005 03.34 081.0 +19.0 005 006 02.15 150.0 +19.0 006 007 04.78 064.0 +04.5 007 008 01.12 085.0 +15.0 008 009 01.41 166.0 +14.0 009 010 01.53 084.0 +06.0 010 011 01.94 127.0 +05.0 011 012 01.72 026.0 +10.0 012 013 01.73 087.5 +05.0 013 014 02.99 167.0 +08.0 014 015 02.50 110.0 +08.0 ;st015 has inlet on right 015 016 02.71 084.0 +04.0 016 017 03.53 064.0 +05.0 017 018 02.74 074.5 +05.0 018 019 02.37 124.0 +09.0 019 020 01.30 092.0 +01.0 020 021 01.32 164.0 +05.0 021 022 01.76 224.0 +04.0 022 023 01.57 160.0 +07.0 023 024 04.41 192.0 +10.0 ;st024 has inlet on right 024 025 04.46 097.0 +05.0 025 026 01.51 039.0 00.0 026 027 03.03 081.0 +07.0 027 028 02.79 156.0 +04.0 028 029 01.89 192.0 +07.0 029 030 06.04 153.0 +07.5 030 031 01.94 106.0 -04.0 031 032 02.37 160.0 +09.0 032 033 01.74 122.0 +08.0 033 034 01.23 148.0 00.0 034 035 01.10 116.0 00.0 035 036 01.14 180.0 +03.0 036 037 03.41 151.0 +08.0 ;st037 is junctio with very tight twisty passage off to right 037 038 02.96 043.0 +09.0 038 039 01.76 015.0 +03.0 039 040 03.37 110.0 +03.0 040 041 01.78 152.0 +07.0 041 042 03.94 120.0 +05.0 ;st042 has inlet on left too small 042 043 01.34 155.0 +03.0 043 044 01.82 103.0 +14.0 ;st044 ends in low cobble bedding *end wr16