;Cave: Pool Sink - Craven extension ;Surveyors: S.Lieberman/A/Whitney ;Date: 22/06/06 ;Instruments: PAG + disto *equate p1aiii.001 p1a.038 ;eyehole at start of traverse to second pitch *begin p1aiii *export 001 *calibrate compass +3.00 *calibrate clino -0.50 *calibrate tape 0.00 001 002 09.44 190.0 +48.0 ;st001 is head height at eyehole at sec.pitch 002 003 02.90 177.0 +04.0 ;st002 is entrance to crawl 004 003 05.61 088.0 +05.0 ;st003 has passsage to tight on left 005 004 06.85 114.0 +05.0 ;st005 has too tight passage to right 006 005 04.04 135.0 +04.0 007 006 02.03 095.0 +01.0 ;passage too tight on right betweem stations 008 007 06.35 148.0 +01.0 ;st007 has choked bedding to left 009 008 03.64 091.0 +10.0 ;st008 has passage too tight on right 010 009 02.16 140.0 +01.0 ;st009 has passage too tight on left in trench 011 010 01.78 036.0 00.0 011 012 03.29 333.0 -03.0 ;st012 is ladder pitch head 012 012a 07.82 - DOWN 012 013 07.82 333.0 -43.0 013 014 13.83 - DOWN ;st014 is foot of aven *end p1aiii