*BEGIN Trib_resurvey ;Little Neath River Cave ;resurvey of Trib passage Sand Chamber to Entrance ;Survey RJ Taylor, RTF Marsh, N Dallman *Date 1970.06.20 ;Source: LNRC Computations book ;Typed in by Graham Mullan December 2008 *Copyright 2008 UBSS ;compass calibration already done *DATA NORMAL FROM TO LENGTH BEARING GRADIENT IGNOREALL *UNITS tape feet ;station 0 is station 6 of "canal" assumed by GJM 0 1 12.2 286 12 1 2 84 348 1 2 3 98 359 2 3 4 59.9 353 3 4 5 22.7 355 0 5 6 24.1 001 0 6 7 26.7 026 6 7 8 2 - UP 8 9 21.9 017 1.5 9 10 79.4 003 2 10 11 98 325 2 ;11 is fixed survey point on top point of boulder opposite ;Canal Bypass 11 12 36.4 341 7 12 13 35.3 253 1 13 14 32.7 341 9 14 15 32.7 038 -4 15 16 64.8 356 4 16 17 30.4 033 2 17 18 49.2 335 4 18 19 25.5 341 9 19 20 11 271 36 20 21 49.7 348 5 21 22 23.8 321 7 22 23 42.1 353 -4 23 24 61.4 004 1 24 25 20.2 322 8 25 26 23.7 252 8 26 27 21.9 280 7 27 28 60.3 343 4 28 29 21.3 356 39 29 30 53.3 339 6 30 31 15.4 002 -40 31 32 7 323 -7 32 33 27.5 317 2 33 34 5.9 246 23 34 35 31 343 8 35 36 9.1 276 -18 36 37 9.6 301 4 37 38 14.2 358 -4 38 39 8.9 052 -3 39 40 24.2 353 10 40 41 8.5 345 22 41 42 60 355 3 ;Station 42 is FSP on 'prow' between 2 BN Isaf passages 5.5 feet off floor 42 43 18.5 259 -4 43 44 10.5 344 1 44 45 11.1 285 5 45 46 8.5 342 4 46 47 16.4 279 5 47 48 6.8 353 2 48 49 11.4 337 2 49 50 6.3 036 2 50 51 6.1 298 7 51 52 10.4 337 -5 52 53 6.1 319 18 53 54 9.9 295 11 54 55 5 267 24 ;55 is FSP in Flood Entrance *ENTRANCE 55 *FIX 55 REFERENCE 91180 14200 304 *END Trib_resurvey