*BEGIN Sump_passage ;Little Neath River Cave ;Book two pages 71-72 ;Typed in by Graham Mullan January 2009 *COPYRIGHT UBSS 2009 *DATE 1969.03.09 ;Date commented out as Survex thinks the world began in 1970 *TEAM T.Reynolds tape *TEAM K.M. Urwin compass *TEAM J. Parker clino *TEAM P.A. Standing notes ;Compass Suunto 808427 ;clino Suunto ; tape to nearest inch *DATA Normal From To Length Gradient Bearing Ignoreall *UNITS tape feet *CALIBRATE COMPASS +8 32 43 22.3 13 223 43 44 37.8 -1 166 44 45 92.7 -4 185 45 46 71.5 -4 166.5 46 47 35.5 1 233.5 47 48 92.8 -1 171 48 49 40.5 -4 185 ;49 is FSP on RH wall, The sump pool starts at 49 49 49a 28.0 -8 187.5 ;49a is part way along sump pool at water level 49a 49b 10.0 0 187.5 ;49b is estimated point where roof meets water at sump 6a (7) *END Sump_passage