*begin 2366_06_17 *DATE 2006.07.29 ;*CALIBRATE DECLINATION 2.42 ; ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ ; 11/12/13 - Adjust magnetic declination so centre line ; surveys are aligned to Eur 79 grid rather than True North. ; Applying correction of -0.4 to original magnetic readings in ; Survex aligns to Eur79 grid. ; ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ *CALIBRATE DECLINATION 2.05; (2.45-0.4) ; 1/8/06 PBW+CH High Level Inlet in RR Torno ; PBW recording, CH instruments = CH tandem + tape 1 2 5.80 297 -8 2 3 2.10 250 -13 3 4 10.65 304 -6 4 5 9.60 313 -5 5 6 2.80 279 -5 6 7 9.50 290 -8 9 8 5.75 202 -1 7 8 1.35 - down *end 2366_06_17