*begin 2366_06_16 *DATE 2006.07.29 ;*CALIBRATE DECLINATION 2.42 ; ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ ; 11/12/13 - Adjust magnetic declination so centre line ; surveys are aligned to Eur 79 grid rather than True North. ; Applying correction of -0.4 to original magnetic readings in ; Survex aligns to Eur79 grid. ; ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ *CALIBRATE DECLINATION 2.05; (2.45-0.4) ; 1/8/06 PBW+CH High Level Inlet in RR Torno ; PBW recording, CH instruments = CH tandem + tape 1 2 7.40 210 +36 2 3 6.10 110 -2 3 4 11.40 243 -2 4 5 4.75 205 -6 5 6 5.70 110 -1 6 7 2.55 164 -4 7 8 3.85 089 +1 8 9 7.40 118 +6 9 10 3.70 157 +16 10 11 7.75 184 +12 12 13 5.50 222 -31 13 14 6.00 228 -46 14 15 6.30 223 -11 15 16 5.10 247 -27 9 16 2.60 315 -5 8 17 10.35 208 -1 17 18 3.70 - down 18 19 2.70 - down 19 20 7.00 032 -8 20 21 3.60 355 -8 21 22 6.50 056 -4 22 23 3.60 104 -5 23 24 3.70 062 -45 *end 2366_06_16