*BEGIN 0103-13-07 ;surveyors Alasdair Neill Pete Eagen *DATE 2013.10.18 ;*CALIBRATE DECLINATION 1.5 ; ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ ; 11/12/13 - Adjust magnetic declination so centre line ; surveys are aligned to Eur 79 grid rather than True North. ; Applying correction of -0.4 to original magnetic readings in ; Survex aligns to Eur79 grid. ; ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ ;*CALIBRATE DECLINATION 1.1 ;Lank's Climb 0 1 9 - down ;disto down climb 0 2 2.94 116 8 2 3 3.23 163 -3 4 3 1.63 34 -18 4 5 3.2 127 2 5 6 2.91 191 0 7 6 3.66 69 -10 7 8 2.24 310 -10 6 9 2.45 141 -19 9 10 2.58 - down 10 11 2.54 150 -55 *data passage station up down left right 0 3 3.5 2 1 2 0.7 0.3 0.2 1.2 3 0 0.8 1 0.3 4 1 0.4 1.7 0.3 5 0 0.8 0.8 1.9 6 0 0.9 1.7 0.9 7 0.6 0.85 1.6 0 8 0.3 0.3 0 0.5 *data passage station up down left right 6 0.2 0.6 0 0.9 9 1 1 0.9 0 9 1 1 3.6 3 10 0.4 0.5 1.2 1.4 *END 0103-13-07