Pollnagolm July 1961 Copy of original. Starts on page 12. Station Dist Bearing 0-1 11 192 2 18 152 3 14.5 267 4 5 289 5 12 188 6 18 261 7 9 179 8 6 134 9 21 194 10 24 117 11 13 166 12 16 113 13 13 192 14 13 233 15 11 145 16 8 108 17 18 192 18 9 234 19 14 279 20 15 245 21 20 154 22 18 174 23 16 132 24 34 176 25 12 231 26 17 202 27 36 97 Ht. of ledge = 12' 28 15 115 29 10 98 30 26 202 31 12 243 32 22 282 33 8 188 34 22 123 35 19 86 36 10 197 37 7 237 38 19 155 39 24.5 91 (38 &39 1st waterfall) 40 16 217 41 11 232 42 11 182 43 16 86 44 10 54 45 11 97 46 27 172 47 12 272 48 12 193 49 7 180 50 38 94 51 11.5 147 52 26 243 53 10 152 54 28 88 Large aven with strong drip (small waterfall) 55 16 123 red flowstone on walls and floor 56 17 198 Upper Meander(?) High dry mud and boulders on floor 57 17 232 58 14.5 209 59 15 111 60 16 207 61 15 222 62 14 187 63 19 272 64 39.5 225 65 12 298 66 10 184 67 11 138 68 13 190 69 19 292 70 13 253 71 13 168 72 14 217 73 19 156 74 9 114 75 11 184 76 34 270 77 26 224 78 27 142 79 24.5 107 80 46 337 81 21.5 159 82 11 231 83 17 170 shelf at 3' 84 26 97 85 32 211 86 23 263 87 18 222 88 23 339 89 31 234 90 51 144 91 36 189 92 32 296 93 19 355 94 36 213 95 31 184 96 23 124 97 64 216 98 26 178 99 20.5 124 100 36 212 101 29 146 102 24 102 (and 101) across slip-off slope 103 22 198 104 24 272 105 46 132 106 30 244 107 41 114 108 18 223 109 26 142 110 16 113 111 46 182 Aven on [on where, left?BBP] 112 35 113 113 no measurement 114 27 181 115 30 146 116 31.5 184 117 21.5 285 118 57 157 119 29 273 upper meanders now in phase with lower meanders. No shelf between upper and lower meanders. Slip-off slopes well developed starting at about 8' 120 13 198 121 51 97 122 56 164 123 22 202 Undercutting at floor level 124 43.5 146 125 30 224 flood debris on shelf 6' from water level. Also small round bank 126 32 115 127 13 168 Large boulders partially blocking passage 128 12 168 End of boulders 129 14 179 130 18 55 131 9 40 [140? EKT] large boulders partially blocking passage 132 15 104 end of boulders 133 20 195 134 16 178 meander 15' to left 135 30 72 136 19 181 137 19 215 138 14 190 [138 to 145, upper meander 180 egrees out of phase with lower meanders] 139 15 212 140 19 163 141 17 201 142 24 212 143 19 194 144 26 116 145 27 219 146 74 189 back in phase 147 24 214 148 27 162 149 11 190 150 27 69 Unnumbered pages. 1958 Survey data - copy Station Distance Bearing 1 24.3 149 2 19.2 162 3 24 248 4 25.6 174 5 12.75 236 6 24.6 163 7 17.8 276 8 28.3 188 9 14.6 103 10 14.7 193 11 31.6 175 12 4.9 284 13 30.4 175 14 21.1 270 15 14 200 16 13.6 280 4 pages on Station Distance Bearing 1 48 230 2 22.9 208 3 22.75 195 4 29 225 5 11.1 254 6 35.75 182 7 37 202 8 19.1 218 9 32.5 184 10 24.4 214 11 36 193 12 17 235 13 58.25 191 14 20.25 160 15 54 203 16 47.5 172 17 45 200 18 16.25 152 19 40.25 216 20 21 162 21 27.8 197 22 18.75 148 23 31.75 209 24 45.6 165 25 93 194 26 57.4 175 27 13 138 28 28.5 175 29 10.7 203 30 12 160 31 22.9 193 32 11.4 238 33 39.4 182 34 12.3 186 35 20.25 131 36 26.6 178 37 33.7 151 38 24.7 193 39 8.5 138 40 18.8 198 41 35.75 178 42 29.75 173 43 19.4 235 44 12.7 182 45 39.3 209 2 Pages on >From HiL.R. to bottom of cave. Copy (1959) Site Distance Bearing 1 100 173 2 100 190 3 81 173 4 85 141 5 100 161 6 93.75 158 7 89.75 166 8 41.5 134 9 100 203 10 63 205 11 93.5 168 12 24.25 215 13 100 121 14 100 148 15 66.5 137 16 84.5 193 17 71 124 18 53.5 155 19 54.7 170 20' oxbow (the rest is unreadable) 20 24.75 220 21 18.5 150 22 31.75 159 23 64 203 24 20 221 25 22 178 26 16.75 181 27 24.25 224 28 26.75 266 28a 40 215 29 12 310 30 150 225 End of Book