*begin StubbingsSewer10
;Cave:Poulnagollum
;Survey Name:
;Description: Survey of second part of Stubbings sewer, upstream from foot of
;			ladder to waiting chamber
;
;Location: The County Clare
;Country:Rep of Ireland
;People - 
;		Inst: Does not say
;         Notes:
;	  Pictures: 
;         Tape:
;Date: 
;Instrument Set:
;Calibration:
;Typed in by John Telling on
;Adjusted for computing by Andrew Atkinson, 2000  
;Source: {Green Book} Silver Series No6	UBSS Poll Ardua 1957
;		
;From  to   Tape Compass Clino Notes
*DATA Normal to  From Length Bearing ignoreall
*UNITS tape feet
*CALIBRATE Compass +14
;Calibration added by Graham Mullan 17 July 2002
;
;Page 10
;
;NB as stn1 has no data I have assumed that the data with a stn is how to get to
;the previous one, so the second column is the data that I have added
;[10/2000 GJM reversed direction when viewing plot]
;1	-	-	Bottom of pitch 10 3/4' high
;next leg added by GJM May 2009 Sewer to BPG pitch
*Begin
*DATA Normal to  From Length Bearing Gradient ignoreall
*UNITS tape metres
1a	1	4	-	Up
*END
*DATA Normal to  From Length Bearing ignoreall
*UNITS tape feet
2	1a	5.5	339	Top of pitch
3	2	6	223
4	3	6.5	285
5	4	8.5	177
6	5	8.25	260
7	6	15.25	338
8	7	15	344
9	8	8.25	246
10	9	5.5	008
11	10	6.25	314
12	11	6	070
13	12	14	347
14	13	7.5	250
15	14	11.25	350
16	15	5	023
17	16	7.5	294	Finished on chockstone on P.A. side of waiting chamber
*END StubbingsSewer10