encoding utf-8 survey PollnagCeim centreline #Survey of the cave down to sump 0ne #Data from Colin Bunce #Typed in by Graham Mullan July 2008 #cs EPSG:29903 cs EPSG:2157 data normal from to tape compass clino ignoreall #fix 2a 112920 203340 242 fix 2a 512918 703369 242 station 2a "" entrance 1 2 4.3 010 0 2 2a 4.4 000 90 2 3 3.1 302 -26 3 4 3.2 322 -40 4 5 2.7 331 0 5 5a 5 000 -90 5a 6 5.4 358 0 6 6a 31 000 -90 6 A 1 120 0 A B 1.7 70 0 B C 2 140 0 C D 3.5 106 0 D E 10 20 0 E F 10 140 0 6a 7 6.3 344 0 7 7a 5.1 000 -90 7a 8 2.8 68 0 8 8a 1.4 000 -90 8a 9 2.1 50 0 9 9a 3.4 000 -90 9a 10 4 28 0 10 10a 5.9 000 -90 10a 10-1 3.3 51 0 10-1 11 2.7 51 0 10-1 11b 15 18 -40 11 11-1 8.5 000 -90 11-1 12 1.5 204 0 11-1 12A 4.5 24 0 12A 12B 2.9 20 0 12 13 4.5 24 0 13 13a 0.9 000 -90 13a 14 1.2 18 0 14 14a 2 000 -90 14a 15 3.7 344 0 15 15-1 1 000 -90 15-1 15a 0.5 300 0 15a 16 1.5 211 0 16 17 8.8 31 0 #17 is start of sump one #set names / #2/X applies to Colin's page "POLL NA GCEIM 3" 17 2/3 4.8 20 -40 2/3 2/4 5 32 40 2/4 2/5 5.4 26 0 2/5 2/6 4.4 18 0 2/6 2/7 5 22 0 2/7 2/7a 1.6 000 -90 2/7a 2/8 2.8 344 0 2/8 2/8a 1.2 000 -90 2/8a 2/9 4.8 35 0 2/9 2/9a 2.6 000 -90 2/9a 2/10 2.6 13 0 2/10 2/10a 0.8 000 -90 2/10a 2/11 3.4 80 0 2/11 2/12 9.95 12 0 2/12 2/13 7 20 0 sump 2/13 2/14 9.2 26 0 #2/14 is start of sump 3 #3/X applies to Colin's pages "POLL NA GCEIM 4 and 5" #legs in squares on his diagram used #back bearings 3/2 2/14 6.5 202 0 3/3 3/2 10.6 204 0 3/4 3/3 8.2 202 0 3/5 3/4 6.3 186 0 3/6 3/5 10.6 204 0 3/7 3/6 10.4 198 0 3/7a 3/7 3.7 000 90 3/8 3/7a 3.8 202 0 3/9 3/8 7.5 206 0 # 7 to 9 is through sump 4 3/10 3/9 20 204 0 3/11 3/10 1.7 152 0 3/11a 3/11 5.4 000 90 3/12 3/11a 7.5 206 0 3/13 3/12 1.4 102 0 3/14 3/13 4.4 200 0 3/14a 3/14 2.2 000 -90 3/15 3/14a 4.2 188 0 3/16 3/15 1.7 232 0 3/16a 3/16 10.2 000 90 3/17 3/16a 4.6 205 0 3/17a 3/17 2.8 000 90 3/18 3/17a 3.8 204 0 3/18a 3/18 3.2 000 90 3/19 3/18a 4.7 200 0 3/19a 3/19 3.1 000 90 3/20 3/19a 1.5 188 0 3/21 3/20 5.4 184 0 3/21a 3/21 11.2 000 90 3/22 3/21a 2.6 194 0 3/22a 3/22 3.3 000 90 3/23 3/22a 1.0 240 0 3/24 3/23 5.5 182 0 3/25 3/24 11.26 190 0 3/26 3/25 4.1 210 0 #26 is start of sump 5 #final leg grade 1 added by GJM 3/26 3/27 500 18.5 -8.0 endcentreline endsurvey