survey cavewildhorses centreline #Kilcorney 1 the Cave of the Wild Horses #Clare, Ireland #typed in by Colin Bunce #typed in on 2010.02.28 data normal from to tape compass clino ignoreall set names / #LRUD at FROM station calibrate compass -1.5 #TB 2008 data begins here fix 1/0 122200 199330 103 1/0 1/1 5.54 150 -15 1 1.5 0.5 0.5 1/1 1/2 4.85 138 -12 0.6 0 1 0.5 1/2 1/3 10.40 140 -2 1 3 6 1 1/3 1/4 7.29 117 -2 1.2 0 4 1 1/4 1/5 4.18 169 0 0 1.5 1.5 0.6 1/5 1/6 2.55 150 42 2 0 2 0.6 1/6 1/7 3.53 174 16 1 1 11 1 1/7 1/8 4.41 165 -50 1 1.5 11 3 1/8 1/9 2.69 223 -48 1 1 1 2 1/9 1/10 4.68 152 -28 1 0 1 1 1/10 1/11 4.36 234 -10 0 1 0.3 0.6 1/11 1/12 3.10 329 -16 0 0.6 0.8 0.2 1/12 1/13 4.06 321 -2 0.3 0.6 0.5 0.3 1/13 1/14 1.69 249 0 0 1 0.4 1.3 1/14 1/15 5.36 188 -3 0 0.8 0 2 #1/16 does not exist 1/15 1/17 6.13 262 0 0 1 0.3 0.5 1/17 1/18 7.59 199 0 0 1 0.3 1 1/18 1/19 5.14 308 +2 0 2 0.4 1 1/19 1/20 7.47 287 0 1 0.5 0.5 1 1/20 1/21 1.55 209 -12 1 0 0.5 2 1/21 1/22 4.26 326 -10 0 0.6 0.2 1.5 1/22 1/23 3.44 240 0 0.6 0 0.5 0.5 1/23 1/24 2.22 267 3 0 0.6 1.5 1 1/24 1/25 2.56 310 -5 0 0.6 0.6 1.5 1/25 1/26 1.16 029 -5 0 0.6 0.6 1.5 1/26 1/27 3.76 289 -22 0.5 0 0.7 1.5 1/27 1/28 3.61 263 -10 2 1 3 1 #1/28 = right hand bolt (higher) of ladder belay equate 1/5 2/0#series 2 is eastern series left 2/0 2/1 2.78 040 -12 0 2 2 1 2/1 2/2 2.55 022 -18 0 0.5 0.3 0.6 2/2 2/3 1.90 040 0 0 0.5 0.3 0.6 2/3 2/4 8.92 310 +2 1 0 0.3 0.6 2/4 2/5 3.98 356 0 0 0.6 0.5 0.3 2/5 2/6 1.86 018 0 0.6 0 0.3 0.3 2/6 2/7 5.50 327 0 0.5 0 0.5 0.5 #2/7 0.5 0 0.5 0.2 #continues very tight towards main entrance, oral connection equate 2/3 3/0#series 3 and 4 and 5 is eastern series right 3/0 3/1 3.43 156 0 0 1 0.3 0.6 3/1 3/2 2.21 124 +2 1 0 0.5 0.5 3/2 3/3 5.28 160 0 0 1 0.5 0.5 3/3 3/4 3.93 100 -20 2 0 10 1 3/4 3/5 3.19 125 -12 0.6 0.6 1 1 3/5 3/6 7.38 126 -9 0.3 1 2 1 3/6 3/7 4.42 110 -10 0.6 0 0.5 1 3/7 3/8 3.90 159 -10 0 1.5 0.5 2 #3/8 1 0 1 2 #choked rift equate 3/7 4/04/0 4/1 3.26 085 -30 0.5 1 0.5 2 4/1 4/2 2.16 090 -8 1 2 0.5 1 4/2 4/3 2.11 145 +2 0 1 0.5 0.5 4/3 4/4 3.10 139 +25 0 1 1.5 1 4/4 4/5 4.92 121 0 0.5 0 0 1.5 #4/5 0.5 0.5 0.3 0 #too tight muddy rift ?connects to end chamber equate 4/2 5/05/0 5/1 3.94 090 0 0.5 0.5 0 0.5 5/1 5/2 4.22 124 0 0 0.6 0.5 0.5 5/2 5/3 2.27 052 -30 2 2 0 1 5/3 5/4 4.00 130 0 0 2 1 0.5 #5/4 not reached Eastern Series Pitch 2 2 0 ~20 & 0.5 equate 1/27 6/0#Into Upper North western passage 6/0 6/1 2.81 016 +10 2 1 3 1 6/1 6/2 1.86 030 -22 0.5 1 0.5 1 6/2 6/3 7.25 306 -2 0.6 0 1.5 1.5 6/3 6/4 2.02 042 0 0 1 2 1 6/4 6/5 3.43 109 +5 0 0.6 0.5 0.5 6/5 6/6 3.26 111 0 1 0.5 2 0 6/6 6/7 3.11 150 +30 0 0.5 4 1 6/7 6/8 5.85 340 -10 2 0 4 1 6/8 6/9 4.86 072 -2 0 2 1 0.6 6/9 6/10 4.67 318 +20 2 0 1.5 0.5 6/10 6/11 7.92 051 +5 2 0 0.3 1.5 6/11 6/12 5.24 358 +5 1 0 1 1 6/12 6/13 5.37 113 +5 1 3 0.3 0.5 6/13 6/14 3.36 059 +23 1 0 2 1 6/14 6/15 5.74 315 0 3 0 0.5 1.5 6/15 6/16 3.20 035 +20 0 0.5 0.5 0 #6/16 0.2 0.2 0.2 0.2 equate 1/18 7/0# Into Bear Chamber 7/0 7/1 4.83 170 0 1 0 0.4 1 7/1 7/2 2.00 130 +10 0.2 0.5 0.3 0.2 7/2 7/3 5.00 145 +4 2 2 1 0 #TB 2008 DATA ENDS HERE #QC/TC 2010 DATA STARTS HERE #8/0 is right hand pitch bolt = AB no 1/28 equate 1/28 8/0#lower main series 8/0 8/1 7.83 247 -73 3 0 2 2 #first ledge 8/1 8/2 7.89 000 -90 1 0 3 3 8/2 8/3 9.43 217 -35 0 1 2 2 8/3 8/4 2.5 301 -63 - - - - #choked sink #8/2 = 9/0 to Lower Main Junction 0 1 2 2 8/2 9/1 7.02 086 27 0 1 2 2 #main junction 9/1 9/2 25.9 190 -2 0 1 3 1 #thro' rift 9/2 9/3 3.71 337 +9 3 0 5 0.5 9/3 9/4 15.5 220 -3 4 0 3 1 #to pitch bolt 9/4 9/5 17.3 170 -62 0 3 5 1 to bottom of pitch 9/5 9/6 10.45 239 -41 1 1 2 0 to junction 9/6 9/7 2.36 157 -5 1.2 0 0.8 0 thro' silt crawl 9/7 9/8 2.43 095 0 1.2 1.2 0.8 0 larger 9/8 9/9 14.43 196 0 - - - - to choked end equate 9/7 10/0#not sure what station these equate to 0.5 1 1 0 10/0 10/1 11.75 235 -5 0 1 0.7 0.2 from junction 10/1 10/2 11.04 236 -2 0 1 2 1 to choked corner 10/2 10/3 3.78 135 -1 0 1 2 0.6 choked corner 2 10/3 10/4 6.15 248 -11 1.2 0.8 0.8 0.3 jn to new connxn to Frog 10/4 10/5 3.25 127 0 0 0.8 0.8 0.3 10/5 10/6 1.17 255 0 1 0 5 0.3 10/6 10/7 6.85 105 0 0.8 0 1 0.5 10/7 10/8 2.05 073 -1 0 1 1 1 10/8 10/9 3.02 240 -35 to silt choke equate 10/5 11/0#not sure what station these equate to 0.5 0.5 0.5 0.5 11/0 11/1 2.35 257 -25 0.5 0.5 0.5 0.5 down slope 11/1 11/2 2.26 190 -53 0 1 0.5 0.5 thro' choke 11/2 11/3 2.33 258 -67 0 0.5 0.5 0.5 thro' choke 11/3 11/4 1.30 027 -57 0 0.5 0.5 0.5 thro' choke 11/4 11/5 8.27 221 -35 0.5 0.5 0.5 0 11/5 11/6 2.37 200 -19 0.5 0.5 0.5 0 to junction 11/6 11/7 10.5 215 -7 0 1.5 1 0.5 to conic junction 11/7 11/8 3.92 348 +20 0 3 1 1 above conic hole 11/8 11/9 5.50 345 -80 bottom of conic equate 11/8 12/0#not sure what station these equate to 0 3 1 1 12/0 12/1 13.36 203 +24 0 3 1 1 to aven & choke equate 11/7 13/0#not sure what station these equate to 3 0 2 0.5 13/0 13/1 2.80 052 -14 0 1.5 1 0.5 to bolt into Frog 13/1 13/2 5.82 120 +2 0 2 1 1 into Frog 13/2 13/3 10.37 220 +28 0 2 4 2 Frog 13/3 13/4 3.00 075 +30 1 1 3 0.2 Out of Frog 13/4 13/5 4.5 085 0 to tie in point from wet canal & MF connection equate 9/1 14/0#From Main Pitch Junction to Gour passage #not sure what station these equate to 1 0 5 1 14/0 14/1 11.04 004 +19 0 1 0.5 0.7 up mud slope 14/1 14/2 8.7 009 -1 0 1 5 1 high level from here 14/2 14/3 2.63 047 +2 1 0 1 0.5 14/3 14/4 5.10 353 +8 0 1 1 0.5 14/4 14/5 11.62 073 0 0 1 1 0.5 to junction 14/5 14/6 9.29 065 +7 1 0 1 1 to Gour Passage 14/6 14/7 5.87 071 +7 0 1 2 1 to jn, alt route to Gour 14/7 14/8 14.52 188 -11 1 0 1 1 to Gours 14/8 14/9 12.22 192 -8 1 0 1 1 14/9 14/10 8.5 181 -8 to Gour Pitch bolt 14/7 14/11 10 015 +45 equate 14/6 15/0#not sure what station these equate to 1 0 2 1 15/0 15/1 5.62 339 +15 0 1 2 1 15/1 15/2 4.66 005 +24 #QC/TC 2010 data ends here #UBSS 1983 reversed data starts here equate 14/10 17/617/6 17/7 8.2 189 -85 #Base of Gour Pitch 17/7 17/8 7.1 225 -28 17/8 17/9 13.39 235 -35 17/9 17/10 2.61 172 -20 17/10 17/11 1.65 136 0 17/11 17/12 2.84 186 0 #through "36B" squeeze by sump 17/12 17/13 6.26 228 -5 17/13 17/14 4.12 178 -5 17/14 17/15 3 270 0 17/15 17/16 5.58 212 0 17/16 17/17 6.08 142 -5 17/17 17/18 8 160 0 17/18 17/19 7.95 193 0 17/19 17/20 6 354 0 #stream enters too tight after 6m 17/19 17/21 8.85 212 0 #rift 17/21 17/22 8.11 209 0 17/22 17/23 3.21 239 0 17/23 17/24 6.95 169 0 #17/24 17/25 10 124 0 #to sump at station 17/25 see series 19 and 20 17/24 17/26 9.95 221 0 #rift 17/26 17/27 2.65 304 -15 17/27 17/28 13.4 224 0 #gour pools 17/28 17/29 1.85 271 40 17/29 17/30 6 198 0 #stream sinks impassable 17/29 17/31 7.3 280 -5 17/31 17/32 2.62 34 0 17/31 17/32 3.6 305 0 17/32 17/33 3.86 236 0 17/33 17/34 2.28 - DOWN #vertically to water level 17/34 17/35 3.7 303 0 17/35 17/36 4.3 358 0 17/36 17/37 4.84 268 0 17/37 17/38 5.81 340 0 17/38 17/39 3.9 298 0 17/39 17/40 1.71 - UP #vertically to roof 17/40 17/41 1.57 324 0 17/41 17/42 4.04 229 0 17/42 17/43 3.45 296 0 #17/43 junction with pullthro passage #UBSS 1983 reversed data ends here #QC/CB PULLTHRO data starts here equate 9/4 16/116/1 16/2 6.54 168 -38 #16/1 is left hand bolt on 5m pitch 16/2 16/3 12.14 204 +41 #16/2 is bolt on fixed rope 16/3 16/4 4.26 092 -03 16/4 16/5 11.52 230 +24 16/5 16/6 5.81 261 +56 16/6 16/7 12 142 +28 16/6 16/8 5.9 228 +81 #16/8 is bolt at top of short climb 16/8 16/9 8.59 230 +9 16/9 16/10 8.9 189 0 #16/10 is bolt at head of 5m pitch 16/10 16/11 3.95 - DOWN 16/11 16/12 1.45 232 -50 16/12 16/13 5.82 284 - 16/13 16/14 3.86 239 +2 16/14 16/15 2.19 175 -23 #16/15 is bolt at head of 8m pitch 16/15 16/16 7.02 - DOWN 16/16 16/17 1.27 202 -1 16/17 16/18 2.96 116 -20 #squeeze 16/18 16/19 1.85 107 +12 16/19 16/20 2.39 161 -3 16/20 16/21 6.11 167 -53 16/21 16/22 3.98 218 -41 16/22 16/23 11.7 271 -60 16/23 16/24 5.8 289 +34 16/24 16/25 2.15 317 -26 16/25 16/26 2.71 050 -51 16/26 16/27 3.07 132 -48 16/27 16/28 2.6 074 -31 16/28 16/29 4.45 140 -25 16/1 16/30 9.90 115 +30 16/30 16/31 9.85 205 +38 #to aven like colapse #QC/CB PULLTHRO data ends here #16/31 is same as 13/15 equate 5/4 18/0#eastern series below pitch data from RS/QC 18/0 18/1 18 - DOWN 18/1 18/2 5.5 016 26 18/2 18/3 4.16 048 0 18/3 18/4 6 050 0 18/1 18/5 3.8 187 18 18/5 18/6 14.6 190 -27 18/6 18/7 3.6 236 0 18/7 18/8 4.45 202 -3 18/8 18/9 10.75 221 -5 18/9 18/10 3.6 251 -3 18/10 18/11 8.94 207 -44 18/11 18/12 8.99 215 -3 equate 17/24 19/0#series 19 and 20 are lower gour passage sump extension, data from RS/QC 19/0 19/1 6.27 134 0 1.5 0 0.7 0.1 # above bearing possible blunder altered by QC & GJM 19/1 19/2 10 059 0 1.5 0 0.7 0.1 19/2 19/3 12.47 047 0 1.5 1 0.4 0 19/3 19/4 6.5 055 0 1 1 0.4 0 19/4 19/5 14.37 067 0 2 0 5 0.5 19/5 19/6 4.23 055 0 2 0 5 0.5 19/6 19/7 9.27 035 0 2 0 5 0.5 #19/7 Roomy sump - - - - equate 19/4 20/0 20/0 20/1 16.26 215 +20 0 1 5 0.5 20/1 20/2 10.10 208 +40 0 1 6 0.5 20/2 20/3 8.85 208 +10 0 1 5 0.5 20/3 20/4 5.83 210 -10 1 0 3 0.5 #20/4 Loose & horrible but drafting boulder choke endcentreline endsurvey