*BEGIN Lowermainseries ;Kilcorney 1 the Cave of the Wild Horses ;Clare, Ireland *copyright UBSS *date 2008.06.05 ;typed in by Graham Mullan ;typed in on 2008.06.10 *team Quentin Cowper *team Tim O'Connell *data Normal From to Tape Compass Clino Ignoreall *SET NAMES / ;LRUD at FROM station *CALIBRATE Compass -1.5 ;1/0 is right hand pitch bolt = AB no 1/28 1/0 1/1 7.83 247 -73 3 0 2 2 first ledge 1/1 1/2 7.89 000 -90 1 0 3 3 1/2 1/3 9.43 217 -35 0 1 2 2 1/3 1/4 2.5 301 -63 - - - - choked sink ;1/3 = 2/0 to Lower Main Junction 0 1 2 2 1/3 2/1 7.02 086 27 0 1 2 2 main junction 2/1 2/2 25.9 190 -2 0 1 3 1 thro' rift 2/2 2/3 3.71 337 +9 3 0 5 0.5 2/3 2/4 15.5 220 -3 4 0 3 1 to pitch bolt 2/4 2/5 17.3 170 -62 0 3 5 1 to bottom of pitch 2/5 2/6 10.45 239 -41 1 1 2 0 to junction 2/6 2/7 2.36 157 -5 1.2 0 0.8 0 thro' silt crawl 2/7 2/8 2.43 095 0 1.2 1.2 0.8 0 larger 2/8 2/9 14.43 196 0 - - - - to choked end *EQUATE 2/7 3/0 ;not sure what station these equate to 0.5 1 1 0 3/0 3/1 11.75 235 -5 0 1 0.7 0.2 from junction 3/1 3/2 11.04 236 -2 0 1 2 1 to choked corner 3/2 3/3 3.78 135 -1 0 1 2 0.6 choked corner 2 3/3 3/4 6.15 248 -11 1.2 0.8 0.8 0.3 jn to new connxn to Frog 3/4 3/5 3.25 127 0 0 0.8 0.8 0.3 3/5 3/6 1.17 255 0 1 0 5 0.3 3/6 3/7 6.85 105 0 0.8 0 1 0.5 3/7 3/8 2.05 073 -1 0 1 1 1 3/8 3/9 3.02 240 -35 to silt choke *EQUATE 3/5 4/0 ;not sure what station these equate to 0.5 0.5 0.5 0.5 4/0 4/1 2.35 257 -25 0.5 0.5 0.5 0.5 down slope 4/1 4/2 2.26 190 -53 0 1 0.5 0.5 thro' choke 4/2 4/3 2.33 258 -67 0 0.5 0.5 0.5 thro' choke 4/3 4/4 1.30 027 -57 0 0.5 0.5 0.5 thro' choke 4/4 4/5 8.27 221 -35 0.5 0.5 0.5 0 4/5 4/6 2.37 200 -19 0.5 0.5 0.5 0 to junction 4/6 4/7 10.5 215 -7 0 1.5 1 0.5 to conic junction 4/7 4/8 3.92 348 +20 0 3 1 1 above conic hole 4/8 4/9 5.50 345 -80 bottom of conic *EQUATE 4/8 5/0 ;not sure what station these equate to 0 3 1 1 5/0 5/1 13.36 203 +24 0 3 1 1 to aven & choke *EQUATE 4/7 8/0 ;not sure what station these equate to 3 0 2 0.5 8/0 8/1 2.80 052 -14 0 1.5 1 0.5 to bolt into Frog 8/1 8/2 5.82 120 +2 0 2 1 1 into Frog 8/2 8/3 10.37 220 +28 0 2 4 2 Frog 8/3 8/4 3.00 075 +30 1 1 3 0.2 Out of Frog 8/4 8/5 4.5 085 0 to tie in point from wet canal & MF connection ;From Main Pitch Junction to Gour passage *EQUATE 2/1 6/0 ;changed by GJM from 2/2 to 2/1 seems to work better ;not sure what station these equate to 1 0 5 1 6/0 6/1 11.04 004 +19 0 1 0.5 0.7 up mud slope 6/1 6/2 8.7 009 -1 0 1 5 1 high level from here 6/2 6/3 2.63 047 +2 1 0 1 0.5 6/3 6/4 5.10 353 +8 0 1 1 0.5 6/4 6/5 11.62 073 0 0 1 1 0.5 to junction 6/5 6/6 9.29 065 +7 1 0 1 1 to Gour Passage 6/6 6/7 5.87 071 +7 0 1 2 1 to jn, alt route to Gour ; 10m at 015 to left choke +45 deg ;6/7 6/8 14.52 188 -11 1 0 1 1 to Gours ;6/8 6/9 12.22 192 -8 1 0 1 1 ;6/9 6/10 8.5 181 -8 to Gour Pitch bolt ;duplicate *EQUATE 6/6 7/0 ;not sure what station these equate to 1 0 2 1 7/0 7/1 5.62 339 +15 0 1 2 1 7/1 7/2 4.66 005 +24 *END Lowermainseries