encoding utf-8 survey WallStreetCC #Surveyed 7/7/7 #Team Julie H, Bill C, Mike R, Pete B #MCG Standard Compass + Clino #Tape Measureements adjusted for 20ms of missing tape #First survey station is the permanently marked S22 in the main stream #Stations ws1 to ws10 are along the passage from the stream (no name ? Threadneedle Street (Mike R, Bill C)). #Stations wp1-wp12 are in Wall Street. #A survey mark (triangle) was scratched on a raised rock at ws8 this is at the junction with Wall Street #At WS9 there are some large fallen blocks, the largest approx 2x3x3m. #The passage that leaves the stream at SS2 closes down with small choked and calcited blocks 2m? beyond ws11. #On the left between ws10 and ws11 there are some high avens. #A small stream flows from ws1 to the main stream. #Wp1 is at the top of the Wall Street break through mound. #Wp4 was on the arched roof, L+R are the width of the passage on the floor. #Some of the later 0 elevations were taken be using stations on a horizontal crystal tideline. #Wp6 was ontop of a stal column, L+R are the width of the passage on the floor. #Wp11 is a dead end, two legs from wp10. # #LRUD at station n is taken with the view from station n-1 to station n # #Station1, Station2, Distance (m), Compass Bearing degrees, Elevation degrees, Left (m), Right(m), Up(m), Down(m) # #Distances with ? are unmeasured estimates. #In Wall Street itself the compass and clino were getting very difficult to #read (wet and muddy). Bring on some better technology! # #I was scribe and tape, Julie then Mike and Pete were Compass + Clino. Pete #did some tape work too. I have some profile sketches in the notebook. If you #want them, I could scan them for you. centreline units clino compass degree units length meter team "Bill Chadwick" notes team "Julie Hesketh" team "Mike Richardson" team "Peat Bennett" instrument length "MCG tape (missing end)" instrument compass "MCG" instrument clino "MCG" date 2007.07.07 #declination -3.001 deg # BGS at 2007.07.07 (2007.52) 51.2987N 2.71038W #declination -3.002 deg # BGS at 2007.07.07 (2007.52) 51.2987N 2.71038W Alt 0.2km. 2010 Model. Updated Nov 2011 # http://www.geomag.bgs.ac.uk/gifs/wmm_calc.html declination -2.449 deg # Allign to grid, Grid North +0.5535 deg extend left data normal from to length compass clino left right up down s22 ws1 4.97 226 +30 1.80 1.70 3.5 0.00 # Up estimated ws1 ws2 4.50 290 +26 1.25 0.50 2.30 0.10 ws2 ws3 11.50 278 0 0.60 1.64 0.70 0.10 ws3 ws4 4.11 264 +8 0.24 0.23 3.5 0.60 # Up estimated ws4 ws5 3.27 284 +4 0.67 0.75 0.30 0.32 ws5 ws6 3.56 278 +20 0.94 1.00 1.70 0.70 ws6 ws7 7.94 270 +22 1.12 1.35 1.63 0.90 ws7 ws8 5.36 287 +12 0.90 1.30 8.5 0.63 # Up estimated mark ws8 fixed station ws8 "WS8 A survey mark (triangle) was scratched on a raised rock" attr print "true" attr Code "fixed" attr Name "WS8" attr LR "left" ws8 ws9 9.47 278 +23 0.50 0.90 10.0 0.10 # Up estimated ws9 ws10 4.54 290 +12 1.50 1.20 1.10 0.60 ws10 ws11 5.40 279 +5 0.65 0.57 0.50 0.55 station ws11 "Up through hanging boulders!" dig continuation attr name "WS11" attr dig "dig" extend right ws8 wp1 4.25 164 +20 0.86 0.44 4.0 0.00 # Up estimated wp1 wp2 4.82 145 +10 0.13 0.13 0.79 0.00 wp2 wp3 2.13 139 -3 0.51 0.74 0.51 0.51 wp3 wp4 7.61 128 +8 1.25 1.25 0.0 0.94 wp4 wp5 5.51 122 -5 0.00 1.09 0.84 0.49 wp5 wp6 5.35 148 0 0.13 0.13 0.48 0.55 wp6 wp7 3.15 120 0 0.00 1.44 2.0 1.15 # Up estimated wp7 wp8 1.58 228 0 0.54 0.00 1.60 1.11 wp8 wp9 3.22 166 0 0.44 0.00 0.87 0.00 flags duplicate # remaining survey is now subsumed within WallStreetDig wp9 wp10 2.32 140 -7 0.00 0.92 1.18 1.20 data normal from to length compass clino wp10 wp11 4.0 105 0 # tape estimated #wp10 wp12 10.0 260 0 # tape estimated # station wp12 "Low wide passage with false floor" dig continuation attr name "WP12" attr dig "dig" endcentreline endsurvey