encoding utf-8 survey BZA_CL -title "BZA Centreline only" # MCG Suunto Compass and clino survey centreline units clino compass degree units length centimeter # calibrate length 0.095 # missing first 10cm - check? team "Tim Francis" team "Richard Carey" date 2007.01.06 data normal from to length compass clino #declination -3.964 deg # BGS at 2007.01.06 51.2987N 2.71038W #declination -3.077 deg # BGS at 2007.01.06 51.2987N 2.71038W 0.2km alt. 2010 Model. Updated Nov 2011 # http://www.geomag.bgs.ac.uk/gifs/wmm_calc.html declination -2.524 deg # Allign to grid, Grid North +0.5535 deg sd length 1 centimeter sd compass 1 degree sd clino 1 degree extend start D12 extend right # length bearing dip Notes on first station per leg flags duplicate # Copy E survey from D11, name it D to use in correcting dodgy Muddy Tube survey # Break survey here to avoid false loops # E11 D12 475 133 4 #Boulder at Zebra Aven - oxbow back in right D12 D13 884 128 14 #The traverses D13 D14 900 124 26 #The traverses D14 D15 570 120 1 #The traverses D15 D16 812 091 3 #The traverses D16 D17 120 099 1 #Gour aven on right D17 D18 840 110 -3 #Mud crawl D18 D19 1525 135 -17 #Left wall, lip of pit D19 D20 1000 129 -3 #Right wall D20 D21 292 127 -1 #Right wall, narrow rift D21 D22 260 261 2 #Descending tube, poor air D22 D23 250 268 0 D23 D24 250 227 -6 D24 D25 255 241 -3 sd compass 10 degree # suspect compass shot D25 D26 566 311 -2 sd compass 1 degree D26 D27 507 158 -6 D28 D27 556 089 4 #Low muddy squeeze, Left wall D28 D29 347 215 -18 #Junction. Closes down at pool ahead D29 D30 770 341 2 D30 D31 1231 337 -1 #Right wall, sump pool D31 D32 700 304 0 #Sump pool flags not duplicate endcentreline endsurvey #BZA_CL