encoding utf-8 survey BoneHole -title "Bone Hole" input 00_Surface/BH_Surface.th #Surface input 00_SurfaceRift2015/00_SurfaceRift2015.th #Surface input 01_Entrance/BH_Entrance.th #Duplicate, replaced 2015 input 01_Tube2015/01_tube.th input 01_Pit2015/01_pit.th input 01_BoneSlope2015/01_BoneSlope2015.th input 02_FirstPitch/BH_FirstPitch.th #Duplicate, replaced 2015 input 02_LadderPitch2015/02_LadderPitch.th input 10_PerforationChoke/BH_PerforationChoke.th #Duplicate, replaced by Andrew's BoneDig input Bone2/Bone2 input Bone3/Bone3 input BoneDig/BoneDig.th input BoneDig2/BoneDig2.th input "04 HappyNewYear/HappyNewYear.th" # Ben Cooper 2015-07-10: # The BoneDig map did not allign with the Surface / Entrance surveys, suggesting there is a blunder somewhere. # Andrew had equated 1.40@BoneDig to 1.3@BH_Entrance, etc. However, looking at BoneDig in isolation, # there is clearly a problem with leg 1.40-1.0 # BoneDig: 1.40 1.0 1.426 216.27 -47.84 #1.40 top left of door to locked bone cave. # Compare this with the similar leg to the middle of the entrance jamb:- # BoneEntrance: 5.3 5.5 1.462 228.05 -42.61 #5.5 middle of top of door to locked bone cave # Also, 1.40 is on the edge of a steel plate so would not have been a good place to take a compass shot from! # This all sugggests that BoneDig 1.40-1.0 should have been a reverse shot 1.0-1.40. I've now reversed this in BoneDig.th # It also suggests that 1.0@BoneDig is very close to 5.3@SurfaceRift2015, and that this is a better equate than 1.3@BoneDig # Making these two changes and suddenly the BoneDig and PerforationChoke maps overlap quite nicely! equate 1.0@BH_Surface 1.0@00_SurfaceRift2015 equate 1.3@BH_Entrance 1.3@BH_Surface 1.0@BoneDig 5.3a@00_SurfaceRift2015 equate 5.5@00_SurfaceRift2015 Surface 5.5@01_BoneSlope2015 equate 6.5@01_BoneSlope2015 6.5@01_tube equate 6.5@01_BoneSlope2015 6.5@01_pit equate 1.13@BH_FirstPitch 1.13@BH_Entrance equate 6.10@02_LadderPitch 6.10@01_BoneSlope2015 equate 1.15@BH_FirstPitch 1.0@Bone2 equate 1.16@Bone2 2.0@Bone3 equate 4.17@LadderLink.HappyNewYear 1.3@Bone2 equate 1.22@BH_PerforationChoke 1.22@BH_Surface equate 1.29@BoneDig 2.0@BoneDig2 join BoneDigSP1@BoneDig 00_SurfaceRift2015SP3@00_SurfaceRift2015 join 02_LadderPitchSP2@02_LadderPitch Bone2SP3@Bone2 join 00_SurfaceRift2015SE278_1@00_SurfaceRift2015 BoneDigSE278_1@BoneDig join BoneDigSE278_1@BoneDig BoneDig2SE278_1@BoneDig2 #Close loops equate 7.4@02_LadderPitch 1.3@Bone2 equate 4.2@HappyNewYear1.HappyNewYear 1.16@Bone2 map BoneHoleMap -title "Bone Hole" #PerforationChokeM BoneSlopeM break #HappyNewYearM [-15 -15 m] above #HappyNewYearM break #LadderPitchM endmap map BoneSlopeM 00_EntranceRiftM@00_SurfaceRift2015 01_BoneSlope2015M@01_BoneSlope2015 01_tubeM@01_tube 01_pitM@01_pit 02_LadderPitchM1@02_LadderPitch endmap map LadderPitchM -title "Ladder Pitch" 02_LadderPitchM2@02_LadderPitch break Bone2M1@Bone2 break LaddedLinkM@HappyNewYear break Bone2M2@Bone2 Bone3M@Bone3 endmap map HappyNewYearM -title "Happy New Year" HappyNewYearM@HappyNewYear endmap map PerforationChokeM -title "Perforation Choke" #10_PerforationChokeM@BH_PerforationChoke BoneDigM@BoneDig BoneDig2M@BoneDig2 endmap map BoneHoleMapE98 -proj [elevation 98] 00_SurfaceE98M@BH_Surface 00_SurfaceRift2015ME98@00_SurfaceRift2015 01_BoneSlope2015ME98@01_BoneSlope2015 02_LadderPitchME98@02_LadderPitch Bone2ME98@Bone2 Bone3ME98@Bone3 HappyNewYearME98@HappyNewYear endmap map BoneHoleMapE278 -proj [elevation 278] -title "Bone Hole" 01_BoneSlope2015ME278@01_BoneSlope2015 01_pitE278@01_pit 01_tubeE278@01_tube break 00_SurfaceE278M@BH_Surface 00_SurfaceRift2015ME278@00_SurfaceRift2015 #HappyNewYearME278@HappyNewYear break 02_LadderPitchME278@02_LadderPitch break Bone2ME278@Bone2 Bone3ME278@Bone3 break 01_BoneSlope2015ME278@01_BoneSlope2015 01_pitE278@01_pit 01_tubeE278@01_tube endmap map BoneDigMapE278 -proj [elevation 278] -title "Perforation Choke" BoneDigME278@BoneDig BoneDig2ME278@BoneDig2 endmap endsurvey